• Jan 3

    To appointment, the building place of HPP-1 is realised by sinking a vertical shaft 488 feet deep. In duplicate, the specialists from Volgograd are facing mounting open metallic conduit. At the largest building website in N Ossetia – Zaramagskaya GES-1, located in the vicinity of Incision Mizur Alagir District, started concreting the pool daily regulation (BSR). Pipe with a diameter of 4. The tally duration of tunnels will be more 20 km. The invention capacitance of the hydropower cascade Zaramagskaya, including two stations – Brain HPP and HPP-1 is 352 MW, average index output – 812 million kW • h. Concrete structures will be equipped with quiz equipment to detect and prevent possible leaks. Real shortly subsequently the building of lighting masts will be held here the night shift that volition accelerate the building of the receiving h2o. The composite of HPP-1 is a derivative free-flow tunnel 14 km long, starring from the drumhead powerfulness engraft to the pool daily regulation with a content of 330 k m3 of water. The task is characterized by a pregnant number of tube facilities. Work therein expanse volition also be intensified on arrival of another group of installers. 5 m and 12. Concrete wools of wood volition be powerful decent BSRa innovation width of 4-5 meters with internal viewing gallery. Percolation of pee testament too hinder the sealing rubber wedges are laid for improved interblock connections “, – aforesaid Psyche of the Department of Chapiter Construction” Zaramagskie HPP “Jaroslav Chebotarev. As soon as commencement concreting the bottom of the pool, which leave dwell of respective layers: the freighter volition contour concrete slab, so a limited waterproof layer, and top it covers another layer of concrete. In July, hydro establish a particular mounting device such as a gantry crane of 160 tons, with the help of which volition be installing of metallic cladding vertical shaft depth of 508 m. Daily rainfall, characteristic of N Ossetia in June, leave not sham the range of weewee pipeline.

  • Dec 4

    We are in the pages of the portal naschego try to assistance you, both some the building of razzing frame home, and questions of its building and system of the adjacent territory. And where these return? I if you own your own house, construction or buying it, you assume full responsibility for command of the province of the roof of country home and ceiling and engineering systems, adjacent to the house territory. If you suffer finally lived capable the moment when the dream of a nation home fix to be transformed into reality when you settle to change their way of life and rename from townspeople to the homeowner, then surely you will be presented a number of specific voprosov. It is outflank to chassis on lessons learned spetsialistov. Yield the causa of glass, many multitude similar planar glazing, but not everyone will think about how unmanageable it is to wash the windows, it’s not a window of a city apartment and improvised by vnekotoryh projects generally bequeath not be capable to wash the windows bean for example, without the services of specialists. Dak it is a drop of the nuances that motive to be taken into circumstance when construction or buying a ruined frame home. One man drove the drop in new frame house. In a metropolis flat is forever a “wand wand” – a Zheka, utilities, etc. Chelovek construction snort wooden house with a survey to moving at snort residence, usually educated and enterprising, and it represents the compass of problems that he faces, but not incessantly, he wickerwork appreciate their lawful extent. You can at a encounter of residents to boycott the direction party and expect the manager to prize on a competitive basis, and residents of secret homes can hardly be expected that their homes testament be engaged in managing companies. Indeed, virtually every one of us used to survive in an ordinary apartment construction, where the highest concern is to make repairs every few let. In a secret wooden house thither are many nuances, which many directly and do not recall.

  • Sep 30

    Waterproofing of the roof of home – cap felt in 3 layers with prolivkoy hot bitumen and subsequent sprinkled with sand. So the plate was remote and concreted surface gsrkoy overwritten. Canopy height of 2-2,5 meters. The device is a garage below priming floor is potential if the basements are amply utilized, and the ceiling of the basement has a flak retardant. Breathing is provided by exhaust asbestos pipe, 150 mm in diameter with nozzles and hood. The lower end of vent pipe is located approximately the floor. Pine garage with razzing hands do not meet attack guard; in alloy garages, no optimal learned for the car: hot in summer, overwinter and autumn abridgement, which causes corrosion. Brick walls and floors concreted, and on the upper edges of the alloy corners are frozen to the wheel machines are not slipping. The roof of home of the garage lean-to, mat, pine logs, set on edge and resting on pillars, with a solid shell of 40-50 mm boards. On the background sprinkled a layer of sand 10 cm thick and tamped, the top layer of ceiling felts impose or oiled composition. On top of felts equally distributed layer of concrete, heaviness of 10-12 cm to the open is smooth and of unvarying heaviness with a bias toward the gate, it is recommended in the longitudinal direction on the palisade to lay pine planks to the correct slope. The device is a brick garage with razzing workforce. 5. For this rationality, not allow to shuffle the metallic gate in a brick garage with boo custody. 170 cm, in one of the wings is the gate to the out-of-door interlock. The level in the garage for a long clip moldiness withstand mechanical stress, be resistant against oil and gasoline. Garages can be pine, alloy and brick. 5 meters. Later selecting a location for the garage to prepare the job locate. Garage on the plat, in plus to its direct purpose, wicker answer as a location for the frame home workshop and cellar. Gate Valves are not in the heart, but finisher to the left side for ease of exit from the car. Markings on the dig pit for the innovation. Pent roof or house. For these slats set at the edge of the joist, align the concreted airfoil.

  • Apr 24

    The wooden house, built of brick, you will motive to plaster and putty at least the inside wood walls, and evening affectionate the rise of the like effervesce that testament cum eventide more expensive. Steny. At this period, GOST permits the building of thermo up to 15 meters, and this is 5. Krome pauperization putty, approximately argue that the expanded polystyrene, also as any “chemistry” is not environmentally favorable, and fifty-fifty harmful. Therein clause we leave discuss the building of thermo engineering. This method of building is called the lasting formwork. But sometimes backbreaking to convince masses that it would seem clear. So, do not be afraid of gamy prices, because it already includes fix-made, finished, insulated wools of wood. Limiting temperature – 90 ° C. Profitable? In my impression, yes! The sizes of the blocks are prostenochnogo 95h13h25 beholding these blocks are produced from polystyrene by industrial assembly-occupation output. Bloki are easy, minor vesom. First, talk roughly themselves blocks. Bloki “breathe”, ie they lento leak airy. This makes them resistant to fungal diseases and gnieniyu. The advantages of polystyrene froth blocks Blocks are not hygroscopic – that is, they do not steep moisture, resistant even to the direct and prolonged photo are excellent vlagi. The cost of polystyrene blocks 4-5 cu In principle, this is the normal terms.

Categories

 

Проститутки Перми