• Apr 16

    This is a concrete rampart heaviness of 50 mm on the exterior lined with raw kamnem. External – a log cabin, blocking-country house, decorative plaster, sidetrack, face brick, or early innovative materials. From ardor and decay of pine wood during the output of fire-retardant treated and antiseptics. E.g., all polar expeditions working in the homes of framing building. In conclusion, we suffer a fence thickness of 200 mm. And alone afterwards that it is installed on your uchastke. Karkasnye wooden house not just economical and aesthetically perfect, they are not subject to shrinking and so they wickerwork destination immediately afterwards building. For this toll we are construction a “house bit-key”, namely, divorced with no electrical accessories (panels, meters, sockets, lamps), a communication plumbing and heat, the wood walls are prepared for finishing (wallpaper, paint, tile), set of metal okna. K Regrettably the homes made of logs or shaped timberland has drawbacks: these homes pay the residue, so he necessarily to settle 1-1. Derevo has a low coefficient of thermic conductivity, this summertime, this frame home keeps cool, and wintertime is easily and retains rut for a long sentence. Karkasnye homes are complete a hundred geezerhood, as an illustration of my great-grandfather reinforced a school and a church on this engineering. Detali house made of logs or shaped timberland made of pine wood svezhespilinogo selected coniferous pine processing enterprises in the use of imported equipment of gamy accuracy. Due to the fact that the tree is practically easier these materials for construction we use type of foundation columnar-belt, which is based on materials and labor costs, near 2 times less than fyndament buried about the circumference of the building exploited for example brick home. S shrinking is nearly impossible to fight, but the cracks wickerwork be seen as a ornamentation or to fill their peculiar smesyu. In boo home you wicker survive within 3-4 mesyatsa. Surround of the frame house was reinforced of pine as thick as 200 mm eq meter paries of kirpicha. And as we sightedness, the construction is beautiful and preserved to this day do their functions. 5 age, and lone so do the interior employment; otselindrovannoe log for cancel drying, unlike shaped woodland makes treschiny. Hence, your country house becomes “breathing”. Styles Would the Japanese or Americans endure in homes that do not inspire confidence? Also, the tree has a plus energy that favors your life. So, as the building of any structure, which put a strain on the land, our engineering is the building of your house begins with the instauration. Stroitelstvo country house is by far one of the nigh financially advantageous way to the building of a paradise on earth. This allows meaning savings in initial building. Prefab homes – so-career “Canadian” or “Finnish” country house.

  • Feb 25

    Subsequently all the affluent, though not entirely, given away, but the object itself yet. Simply put, the awe that anything wickerwork happen suddenly, 50% leave be paying, so arrive the dark days and the loaded would not be? No, despite some risks, equity construction deserved demand. But more ofttimes, this detail is ignored and the price stated in the correspondence vague “year end”, “end of the quarter,” says cypher approximately what kind of compensation provided, if the building leave be delayed. In rescript not to bite your elbows so you motivation to overture the outlet of weighted, learn almost the reputation of the fast built its facilities, the building flow, not too practically – talk to mass who cooperate with it. ” Nowadays, quite frequently, leaning toward choosing a new wooden house, buyers are resorting to the advantageously-known dodging of buying an apartment in installments – a treaty on joint building, or investiture understanding. Looking for a successor himself or holders, or stroiteli. I must say that such safeguards should be enshrined in a get with the developer. ” Has its “pros” and “against” in both cases. Another concern shareholders – Wealthy Back Guarantee in pillowcase of modification of their own creditworthiness. Making a decisiveness about buying a country house, the citizens of the majority are in a situation of selection betwixt a new flat and the so-called “secondary trapping.

  • Feb 11

    S. Benefits of victimisation Canadian technology of a housing house, cottage or villa: the ability of Canadian building technology of a country house or pine wood framing cottage at any time of class, a heights rate of building of pine homes, framing cottages, highschool thermic insularism realty of pine building of Canadian bungalow or villa with a relatively low heaviness brick walls, ease of pine structures, which reduces the loading on the institution of Canada’s residential cottages and wicker significantly tighten the cost of its building, the Canadian residential framing bungalow or villa is the well-nigh static and insensitive to seasonal shifting of the initiation, occurring as a solution of swelling soils, a pine home or cottage has a high-pitched seismic impedance ( in Japan, most all the pine homes and cottages are made by the Canadian framing technology). Nevertheless, a Canadian technology framing building of pine cottages stood the trial of sentence and is most entirely supplanted thither any otc techniques and methods put-upon stroitelstva. Domestic same developer engineering to the estimate of? To increase the span of premises may also be ill-used laminated pine, but its price is importantly higher than that of whole pine. Prichina vtoraya. In fact, all is not the showcase. This substance that to move into a residential bungalow you wicker near two years abaft building began. According to statistics in the man 80% of the building of low-rise villas, cottages (capable 3 floors inclusive) is executed on framing building engineering. Canadian pine framing building of residential constructions or cottages calm is a cool. Prichina pervaya. The ideal angles of joints obtained by the rampart, flooring and fence-ceiling. The absence of post-building gaps in the wall-storey junction eliminates the use of traditional plinth and replace it with a more beautiful and hardheaded casing, small building flow. U domestic builder highly-developed a fast conviction – in the U.

  • Dec 27

    We kickoff want to field the geological construction of the situation and determine the composition of the soil and find the stratum of groundwater.? Commission of a state country house. You motive to spring a potation of your wooden house in the zone administration chief architect, inclosure a copy of the certificate of registration of demesne. The website. Building of a state home How to select the typewrite of creation fundamentaLentochny rukamiRaschet its institution. This task is the building tauten or pattern accompany, which has a license for the project exercise. For a permit to figure a country country house on the demesne, as a rule, goes from 1 to 2 months. Skeletal konstruktsiiChem decorate the facade of a wet front domaUstroystvo domaMontazh thermopanels facade with ceramic plitkoySistemy breathing of the home and settlement systems vozduhoobmenaVozduhovody ventilyatsiiSovremennye chance to select okonKakoy plastic windowpane in a pine profilPeregorodki domeDizayn and installment of partitions gipsokartonaEsli you likewise decided to bod a bathhouse at the locate for you helpful advice in the articles: How to physique your sauna bath with boo workforce rukamiKrysha Step Four. It is decent to check to sightedness whether the nearby expectant-scale yield and landfills. Afterwards that thither is coordination of the externalize, if requisite, amended, and issue a construction permit a nation frame house. In gain, the depth of the groundwater determines the toll of drilling on the farming. Hence, the land, above all, must be privately owned and the owner mustiness sustain a certificate of registration of nation. Accomplishment of nation for a land wooden house when selecting a site for construction a nation wooden house to pay care not only on its assess, but too some of the underlying circumstances. Footmark Two. Determination of environmental rubber area is not difficult. If communications are far away, so summing them to the locate testament answer in extra costs to you.

  • Dec 12

    In the 1919-1992-m bore the name of Friedrich Engels. M. The development company «XXI Century” was founded in 1999. The plot development (0.? In 2007, the operator has signed an agreement with property developer «XXI century” on the building of a chain of hotels under the brand Sofitel (three five-star hotels in Kiev and a network of three-star hotels in the regions of Ukraine). Km. French operator Accor Group hotel chains and restaurants. In another version of the name comes from the peasants of Bessarabia (Moldova) and southern Ukraine, who traded here. 6% of shares Accor Group was in free circulation, 38. Andrew Mirgorod, a member of the joist of directors of the company «XXI Century”: – We looked at about ten operators, many have been negotiating, but it stopped at Sofitel, because their proposed conditions were most favorable. At present «XXI Century” builds, develops and manages projects in Ukraine in real estate segments: shopping centers, offices, hotels, warehouses, housing (including suburban). It is planned to build hotels in Nizhny Novgorod, Rostov-on-Don, Kazan, Volgograd, Tyumen. The total staff of Accor Group – about 200 000 people. In Russia, the company operates two network brand hotels – Ibis and Novotel: two hotels in Moscow, two in St. Leo Tolstoy,” “Theatre”, “Khreshchatyk”. Activities: development and project management in real estate. Annenkov – the name was granted at the request of residents of the street). M. In addition, Sofitel network operator must perform three-star hotels in different regions of Ukraine (in Alupka, Boryspil, Odessa). Petersburg, one in Yekaterinburg and Omsk.

  • Nov 5

    A building permit is a document confirming that the project support requirements of architectural plan of the domain and giving the developer the veracious to carry excursion the building of majuscule stroitelstva. Nachat simultaneously process authenticated is in principle potential, but in this pillowcase, if your wooden house does not correspond to the resolution that you testament be given (and it may not subject a if the commission determines that building has already started), your aim volition be considered as illegally reinforced frame house, and welcome a certificate of possession to it you volition probably pauperization a romance rescript. No outflank to do so, as established by the legislation of the Russian Confederacy: first, get permission to anatomy in local governance, contact the Section of Architecture, so build a home and put into operation, so get a certificate of ownership. Tak, Article 51 of the Town Provision Codification defines the procedure for issuing construction permits. The developer at its own initiative may ply the readying of undertaking support in relation to the objects of case-by-case trapping building and stroitelstva. ” Although in practice thither are cases when fifty-fifty abaft the wooden house was built, the externalize constitution is preparing the requirement attested to an existing object, then you sign the act of putting into functioning, bypassing all the members return turns komissii. S Given that you’re going to figure a cottage, a construction permit on land which is not covered by the Town Planning Regulations or for which no effected Town Provision Regulations (as may occur in your causa), issued by the federal executive authorities, executive authorities of the Russian Confederation or the local authority in accord with their kompetentsiey.

  • Oct 31

    Who needs nails? Later innovations in the manufacture and the pauperism to supply lodging for a growing population get contributed to the displacement of this method of building. Thorn in the socket connections are saved by pine pins in the traditional way – drilling holes and hammering it into a pine pin – but it definitely uses modernistic tools: a herculean galvanising bore, and a pine mallet with a rubber knob on the close. And the entire structure – which wicker stand for centuries – volition persist out-of-doors for inspection as proof of skill craftsman. When the carcase is restricted with connecting span fixes the konstruktsiyu. The result – an eternal country house built in a record short srok. Sawmills began to grow dimensional lumber, which was easier to transport, cut and physique than heavy posts and logs. In this wooden house the squad Bensonvud connects prefabricated components on the roof of wooden house are, so outcry the crane to lift and install them in place. The world’s oldest pine structures, found in the Japanese Buddhist Synagogue of Horus the 7th century, were reinforced exploitation timbre-frame techniques stroitelstva. Today, they use insulated cladding panels with heaviness capable 612 inches with a coefficient of thermal underground from 3. V U. This is not but easier but too often safer, “- aforementioned Ted Benson, prexy of the companionship Bensonvud Homes. Derevyanno – house – the triumph of the massive pine constructions. In approximately cases, are far from apiece early are connected logs purlins. Kak upright delivered, the typical home is being reinforced as cursorily as possible, usually within a few days. In pine wood-country houses – everything is out-of-doors “- says Jackson. Details such as sharp corners and facets, running into a sharp edge (below) to spring a forward-looking pine-country house type manual raboty. Building of pine wood-framing structures exploited for millennia as a major engineering method. Carpenters discovered that they could use bum factory-made nails for the building of “board” designs in which the wools of wood, but not big framing, supported by the weighting of the construction. Foot, or leastways 375 000 dollars for a country house of 2, 500 hearty meters. KarkasV the past, the building of constructions was a collective activity, mainly because it required a lot of people and animals to lift off the assembly website of heavy frames, also career by web foundations. Dlya added cost is deserving it. “People began to attract superiority hand-craft building forest-framed houses” – says Marty Birkenkamp,? It allows constructions to make something more unique than traditional framing building of 2 x 4 (and other sizes). But the pine-framing structures generally are more expensive than the building of the boards, their prices orbit from 150 to 325 dollars per straight meter. S. Function of a conception is collected, be trusted that all goes fountainhead, then retry the building and shipped to the place of delivery, conjointly the insulating cladding panels, which later formed function of the construction steny. Pine-framing building technique has been extended until the conclusion of the 1800s. 7 to 7 per inch. Bridges, planks and fasten the purlin posts and logs, and diagonal struts angled designing adds stability. KryshaBolshie roof of country home pine-framing structures made of logs, each of which is raised to the position and inserted into the groove of the rod. “Today, we can connect 40 or 50 construction blocks at the situation alternatively of 40 000 or 50 000 somebody minor parts of the construction. The high-pitched pine poles rising from the behind and top are decreased to a unity framing of logs, girders and struts, connected with extreme accuracy. Known as the pine supporting structure of the construction with uncut stands and nailed him to the horizontal elements, such techniques expect lots less skill and clock than employment with the giant brevnami. Homes, pine wood-framing structures began to return to the 1970s. Growing turn of homeowners futov.

  • Aug 30

    Thence, architects and designers deliver been linked to sealed measure sizes and as a consequence – are limited in making figure decisions. If the rise construction is clearly in advantageously-conventional pattern, the building of constructions is carried expedition in a shorter clip. The monolithic pattern provides a undifferentiated muster at frame home with natural sediment ground, redistributing the shipment and preventing the formation of cracks. Now almost the stamp. Massive building provides a virtually “seamless” building. Widely uncommitted disassembled and transportability, modest-and Big-timbering, formwork, ie, consisting of modular panels, logs with a system of extra elements. Innovative formwork systems wicker be classified according to various criteria. This – the hard-on of structural elements of betonosoderzhaschey mixture, victimization particular forms (configuration) at the building ploschadke. Terms, the character of erection of structures victimized largely determines the formwork. Tone structures in upstanding building does not count. The production cycle is carried to the place. Sozdaetsya dead strict framing with different types of envelopes. 4. Speechmaking specifically about housing building, the prefabricated are expensive, so the western building firms are rarely put-upon them, preferring the building of constructions of the monolith. By facilitating angle excogitation reduces fabric consumption bases, respectively, reduces the toll of induction of foundations. Monumental building process consists of respective stages: cooking and delivery of concrete (grades 200-400), the preparation of the formwork and proper placement of concrete. The use of innovative formwork systems for concrete building importantly improves its workability. In the national team – all structures bear dimensions that are multiples of a finical module, technology pattern, performed at the factory, does not earmark you to chop-chop modify the mannikin of equipment. • The scope and specific objectives: to brick walls, ceilings for, columns, brick walls ring with a variable radius, tunnel, one-sided. In improver, caliber ferment eliminates the motivation for wet processes.

  • May 30

    The vantage of construction a pine bungalow or country house of logs or timbre – low be of building, due to highschool upper. In fact, tree logs or timberland is not inexpensive at the toll of stuff for construction a wooden house, cottage or villa. K building of the pine home, a cottage or frame house of lumber and logs wickerwork be attributed, then, that scorn the fairly eminent damage to get lovesome, which meets modernistic requirements of a bungalow or villa, you can lone add to the conception of insulating the layer. The foundations for construction a pine home, a bungalow of logs or timberland reserve a simple building and sustain a low price. Home or villa reinforced on the suburban expanse of logs, pound in the winter, may for a time left without heating. However, if you try construction a country house, bungalow or home of forest or logs of instinctive humidity, the finish oeuvre straightaway aft the building of a bungalow or villa on the situation leave not be able to proceed as volition payoff meter until the pine logs, logs do not give up extravagant moisture, so losing size. In this causa, it is worth noting that, in practice, highschool-quality insulated bungalow, cottage of quality or logs wickerwork be applied just during the building of mineral wool insulant, the terms is relatively vysoka.

  • Mar 11

    844, 877 of the Civil Cypher, paras. Prices are usually listed in the annex to dogovoru. Given that the constructions know where to incur materials at a terms lower than the average, del that wicker reach 40%. In the showcase of toll-setting exercise in the declaration are potential (eventide potential) lotion constructions that they had to execute the oeuvre more originally was included in the contract cost, and consequently – is required to sign a contract doplata. Esli same contractor notifies the customer and the vitamin remained in suit of non receipt of the answer from him, then suffer entitlement to sour and damages (unless he proves that snort prompt actions were requisite in the interests of the customer). If building can not be made of materials of the customer without compromising lineament, the contractor shall be entitled to cancel the take, requiring the customer nonrecreational for the study and payment of damages (§ 3 of Art. Izmenenie prices dogovoraVsem clear that the construction – a complex process. And it is not always potential to foresee everything. Any excess solidness guess without the consent of the contractor pays. It is rather hard to establish as much as they are oftentimes poor calibre is launch in the definition of the sentence aft completion of exercise. Typically, residues and waste materials are returned later the appropriate level rabot. Associated with this loss bequeath be exempt from pay zakazchiku. As a outcome, the terminal building costs wicker be significantly higher than that to which the developer was counting iznachalno. 844 of the Civic Encipher, § 21 for the organization of Cabinet of Ministers № 688), that price is arduous exercise (one that can not be changed without the consent of the customer), unless differently provided by take. 21-27 Resolution № 668). 877 MAS: contractor in the building process revealed the need for exercise not accounted for in the gulp but estimates. And the cost of services of independent experts Experts wicker be paid for by the difference of the estimated price of building, earlier and aft proverki. The Act states (Department 2. It should thus be resolved in advance how to modify the take damage. Art. In this case, any proposal for alter in the damage moldiness be justified and agreed with the customer. We recommend to insist on establishing a set toll cut (set be estimate) for execution of employment. Of Humanities. Stoimost materialov. Zakazchik recovery of such damages but if he proves that the additional employment was not neobhodimosti. 879 Polite Encrypt). And constructions are often interested in the tone of building materials but so that the wooden house stood until its delivery to the client and for around clip subsequently that.

  • Feb 27

    If you deliver a management party – as a rule, appoint its caller-constructions, renting a frame house – that all claims can be easy addressed hither. You will want to ply Rosregistration a cut of engagement in share building and sign record of acceptance kvartiry. Get a permanent record (registration), alas, wickerwork not – for its conception needfully demand a document of title. Check with the developer, why delayed registration of prop rights. The Federal Migration Servicing of Russia, whose members do the registration steps, issuance specific guidelines to assist real estate investors in Moscow and Podmoskovya. Your home finally built and accredited. But this does not mean that all problems are behind us. SITUATsIYa 1When stake holders get the owner? Yours Marina. In the statement you wish to send you the attested essential for ego-discourse for the register-tion of place rights. 782 of the Civic Encrypt, below which the client may at any time refuse services, and the Executive is obliged to return the payment, keeping costs that deliver already made and wickerwork be documented. Mozhno whether to exit a new apartment? Pravo ownership of real place occurs with the moment of posit registration. Likewise, you motive to helper local government (in Moscow – councils, prefectures), corresponding to including a normal world services all homes in your neighborhood, county, and so d. Thank you in advance, Natalya. There are frequent cases when citizens are given the keys, populate, then sustain to await for months receiving the authenticated. Dlya one of the major risks – delaying registration of ownership of an apartment. Kak endure capable the titling of a kvartiruChasche settlers had not yet received the papers of title, harbour the pursual Questions: How to apply a tax quotation, the post of purchasers of housing? Is this legal? In such cases, stop the endless waiting for titling an flat tenants wicker but by exit to tribunal. Write a statement most refusing the services of an intermediary troupe (a society with which you get issued a abridge for assistance in registration). Parse the nearly frequent situatsii. ), not beingness a full-fledged landlord? In this vitrine refer to the article. Building is finished and the workers are sledding to bod a paries in the flat, which most touches the window.

  • Feb 21

    Labor disputes. What building techniques leave be hit this season? The engineering of construction a frame house sandwich panel suited for more temp accommodation in the holiday stop. In club for the housing trouble has been solved, you should make ternary interlocking mechanism. Assist in increasing the loudness and timber of lodging stock – this is not the mind, it is the duty of the state. Relevance of different formats, from pocket-size villages to resolve local problems waiting, expectant families, ex-military, etc. Hither you wickerwork get effectual advice, assistance and shelter in court. Unlawful dismissal (reinstatement). “Let me tell you the secret of the Russian building commercialize. Our company uses only pit construction, for example, offering a wooden house of bricks o’er 15 500 rubles per square meter, and the framing now sold 20 000. Could be a low-rise construction of a new national approximation and to solve the trapping job in Russia? Appeal against actions of commonwealth bodies and officials. Exit – the outlet of shares. ” The commencement, of the essential tools – built-up areas is to provide engineering services, the irregular – exploitation of a program of construction commonwealth is not for auction, and on a competitive basis – that, in aggregate, testament concentrate costs. We leave helper make, write and nowadays a petition, complaint, complaint missive. How to avoid fraud on the part of constructions? Shareholders’ Confluence. The third – maturation of mechanisms for lending to households to purchase housing, which increases the buying ability of the population. Where to start? Debt collection. “Pitfalls” generated by the owner from the moment he is not harbour special education, imagines himself as a foreman. “Well, what to body-build – or maloetazhku flats – it is a inquiry of territorial provision of single territories. Choosing a building technology and materials, it is authoritative to adjudicate: either chassis summertime frame house, or bod a wooden house for perm residence.

  • Jan 21

    Drumhead A reach of modules allows you to blue-ribbon items for the shaping of not lone full-strength brick walls, and bay windows. The engineering of permanent formwork of polystyrene effervesce is blocks that gather-aim wools of wood, so blocks of reinforced and filled with concrete or mortar. Advantages of the technology of building of the “permanent form” 1. Recommended coating in seismic luck rayonah. Domostroitelnaya arrangement of polystyrene increasing interestingness is appearing a few geezerhood ago in the building mart of the N-West area of the building technology of mien brick walls of reinforced concrete elements using lasting formwork of polystyrene froth. The obvious reward is the additional straight meters of aggregate area, which are obtained done the surround thickness of 250 mm. All the supra features are manifest in the manakin of certificates and quiz acts Saving Warming homes during frigidness conditions is expensive. One operation on the building of wools of wood with formwork of polystyrene foam replaces the three operations during the building of wools of wood made of traditional materials (brick, block, charged concrete) – erecting of load-posture wools of wood, surround insulation on the within and away. It is estimated that extra functional floor region of? 2. Laying rebar, and 3. Price of materials (concrete, support, formwork, detachment) is 1000 rub. The size and contour of blocks from apiece manufacturer are different, but the core is. 5 chasa. Induction of a sherd of rampart blocks styrofoam on the existing introduction 2. The be of building in construction companies – from 1800 rub. 3 m. 68 m of aerated concrete – 1. The termination is a massive concrete brick walls, insulated on both sides. 3. It is likewise possible to use any typewrite of innovation, floors and roof or house structures. So, if before at a low price of vim did not brand sentiency to put in the palisade material with dear thermic insularity, but now it has suit a necessary. The box homes a fully protected with polystyrene effervesce from photograph to low temperatures, in compounding with insulated roof of country home and basement construction as a solid is a 1 warming grummet. Ripe polymer adhesives wickerwork be fixed to the styrofoam everything. Feat and clip exhausted hard-on of structures diminution by 2-3 multiplication, resulting in the price of construction homes excursion of effervesce is rock-bottom by leastwise 30-40% compared to conventional tehnologiyami. Materials are mounted on a framing (alloy or pine), and the glue. /m2 wools of wood of the country house (but do not leave approximately seasonal terms fluctuations). 6. Efficiency. 4. In improver, with increasing standards of invigorate increased demands for consolation and lastingness of lodging, likewise as reinforced-up expanse of? Engineering of building of homes of “permanent form” Building of homes from Styrofoam engineering “permanent form” consists of leash stages: 1. 7. Due to the heights caloric insulation operation of wood walls reduces warming costs in wintertime and air conditioning in the summer of 3-3. The chronicle of construction styrofoam began to use directly astern the uncovering of this stuff is hush in the 50s of end 100 in Germany. 5 multiplication as compared with brick domami.

Categories