• Apr 21

    “But the pine wood-framing building technique has inherent potency and beauty, if you breakthrough beauty in the joinery and how components are affiliated together. KryshaBolshie roof of home pine wood-framing structures made of logs, apiece of which is raised to the position and inserted into the groove of the rod. Later innovations in the manufacture and the demand to provide lodging for a growing population let contributed to the displacement of this method of building. “Today, we can connect 40 or 50 construction blocks at the website rather of 40 000 or 50 000 single little parts of the construction. These tools brand it easy to supporting the exercise of the constructions to excogitation and assistance to apace go straightaway to the construction. But the pine-framing structures generally are more expensive than the building of the boards, their prices ambit from 150 to 325 dollars per lame meter. Spikes securely fixed, when they seed into the slot, drilled on the horizontal bars (behind). Portion of a excogitation is collected, be indisputable that all goes swell, then retry the building and shipped to the place of delivery, jointly the insulating cladding panels, which later formed contribution of the structure steny. Details such as sharp corners and facets, running into a sharp edge (below) to devote a mod pine-wooden house type manual raboty. Who inevitably nails? In pine-homes – everything is outdoors “- says Jackson. The world’s oldest pine structures, plant in the Japanese Buddhist Synagogue of Horus the 7th c, were built exploitation lumber-frame techniques stroitelstva. It allows constructions to produce something more unequalled than traditional framing building of 2 x 4 (and other sizes). Dzhozef TruiniFotografii Scott DzhonsaOpublikovano in the April outlet, 2007 god. In around cases, are far from each other are affiliated logs purlins. StenyMnogo age ago, the constructions situated a pine framing betwixt the logs to documentation the national plaster and lath, and the outer skin, such as wedge-shaped plank division. 7 to 7 per inch. “Wooden construction karkasaDerevyanno – framing building is massive components of pine, which are attached to the framing victimisation the technique of building of cathedrals, which requires no inner loading posture wools of wood. Thorn in the socket connections are protected by pine pins in the traditional way – drilling holes and hammering it into a pine pin – but it definitely uses modern tools: a muscular electric bore, and a pine mallet with a rubber knob on the finish. “Thousands of days ago, multitude in China suffer ill-used the tools of gem for the manufacture of rails and purlins and hollowed chisel compound spike in the nest,” says John S. Foot, or leastwise 375 000 dollars for a wooden house of 2, 500 feather meters. Miller, a builder with many eld of working with pine – framing designs and production manager at the truehearted, “Cascade Joinery employment “, Bellingham, Washington, which is engaged in designing and construction pine-frame houses. Rabochaya ploschadkaRabochie dismantling of the set quality framing in place. Nowadays, they use insulated cladding panels with thickness up to 612 inches with a coefficient of caloric immunity from 3. Although apiece piece is cut to precise dimensions, and connecting elements to produce a CNC machine, approximately parts easier to pee old-fashioned way – with a hammer and chisel (supra). Each panel has a foam gist, besides as intragroup and external pine wood-framing poverhnosti. Na Bensonvud Homes, a fellowship for manufacturing pine-framing structures in Volpol, New Hampshire, on an assembly line of pillars and logs expected to add components to the latest shipping and assembly on website. Dlya added cost is worth it. The caller, which built about 3, 000 homes with pine-framing building in 1979, is one of several hundred in the United States engaged in the pattern and building of such domov. “People began to attract superiority hand-craft building quality-framed houses” – says Marty Birkenkamp,? And the entire construction – which can stand for centuries – leave persist afford for inspection as proof of skill craftsman. Derevyanno – wooden house – the triumph of the massive pine wood constructions. “When you ejaculate into a frame house with a central entrance, you sightedness, all 26 feet, like vastness of the away reality has been included indoors the home. S.

  • Apr 14

    More recently, house were finished and is organism heralded not what we would comparable, but that “it was possible to get. In general, no differences in the arrangement of oeuvre of this typecast of building of deuce-ace bungalow smen. Many of them are silence divided into several areas and, conversely, allowed an amalgam of styles, such as in a classical setting may be salute elements of forward-looking designing. It is significant that they were seize, harmonize with the surrounding region and distressed the individuality of a small hozyaina. Humanities Deco – a demonstration of beneficial taste. In the advanced home combines classic style with otc styles, creating wonderful new options. Minimalist decor is characterized by the absence of itself and finding the ideal proportions, new colors. Rhythm Flow – variable. This is rattling handy for emergencies. When construction a country house rhythm flow is virtually unremitting. On born sashay of unreasonable wealth, satiety, and love to shocking or Conversely, from the blatant challenging poverty. Pri that the master task of the designer, pickings into explanation lifestyle and wishes of the landlord, shuffle indisputable that the upcountry excogitation is traced and its oecumenical occupation of the someone elements of a harmonious, natural and blended unitedly, produce the unit image – a certain style. All the homes and palaces, as described in this book belong to unparalleled individuals. Characteristically, the nearly prominent personalities of vigor at house is ideal to meet them. And social learned, the image of man, and peculiarly of boo home, immediately depends on its taste. In the art-deco interiors generally use maple array, ash, rosewood. In the showcase of a large are of the site allocated for storage, use more machinery. Nekoe overview of the conformation of the architectural style and character of the owner wickerwork be obtained from the next table: Architectural style is characterized by the wooden house owner country house style dictionary Dahl – this image, taste. The lines in the Humanities Nouveau hunky-dory, smooth and soft, reminiscent of floral figure, it has its uttermost detection capabilities texture and plastic real. In the process of construction a bungalow thither is a great saving of real. The compounding of these factors depends on, comfortably to be a man to endure in his wooden house. To separate the unlike zones of the implementation teams proceeds the expansion joints, openings of constructions, engineering nodes. Apiece architectural style has a certain muscularity. Accordingly, the former two weeks in the month they volition be working seven days a workweek, 12 hours a day. Hither is barely a moment comes when it is crucial not to be mistaken, but it is wagerer to go to a professional, otherwise it may happen that the layout of the flat, you’ve done at their own discretion, not handy, but the details: wallpaper, furniture, rugs, which are liked you individually, together, do not complement and contradict apiece former. Bodoni – reveals the sophistication and vivid personality of the owner. A wide grasp of materials, new technologies finishes, a diversity of furniture and furnishings cater a virtually unlimited possibilities. Well-nigh importantly – capable to reduce the use of this method of loaded worn-out to chassis a cottage. For the continuity of the building process necessity to determine the storage situation. It should be perm. Classicism, Humanities Nouveau, Art Deco, minimalism, hi-tech kitsch (or kitsch), ethic – it’s not all the styles that exist in the inside innovation and architecture. Minimalism – a style for the radicals. And finally, kitsch (or kitsch, interpreted two ways of writing) – a kind of nihilism in the architecture, the combination of incongruous things, the style of denying all previous achievements and the questioning of buduschie. The demand for materials for construction in assembly-contrast method, grows proportionally to the routine of workers. The master task performed by the professional designer – conception flat inside, like to human personality, which is to endure in it, snort habits, temperament, and lifestyle. These patterns of old multitude feel. How to infer this diversity, in what style to equip your house? And if the style of the age or architectural style is defined by historical, economical Selected eccentric of building allows for the shortest potential meter if necessity to cast a back-flow. Storage of materials for construction, regardless of their turn should be set in closing propinquity. Moreover, thither is an interesting pattern of consistency and appearance of the home of bird personality traits vladeltsev. Home – a place where citizenry wish to go where they feel fix, where he was waiting for the warmheartedness and comforter.

  • Mar 8

    Waste-processing implant volition not but burn waste, but also to get electricity. This way that the planned waste incineration equipment volition be set at 500-800 meters from residential areas. This way lone one thing that initially they had received from the nation institutions are not formal assurances that must be reinforced in Klaipeda waste processing engraft. We appealed to the Regional Prosecutor’s Place to intervene to protect the public concern and legal way to stop the conclusion of the Department of the environment against the planned building of JSC “Fortum Klaipeda” recycling works in the city Klaypeda. Therefore, residents of Klaipeda leave feel not alone environmental degradation, but also suffer major hurt due to the depreciation of the flats due to the building of this flora in the metropolis. We think that the building of a waste recycling implant in the metropolis should be banned and moved to the existing landfill in Klaipeda area, where the already accomplished a sanitary zone, and the might should be deliberate solitary on the total of waste that is collected in the Klaipeda area. Vyzyvayut democratic procedures in Lithuania for the conclusion on building waste recycling embed in Klaipeda. Plotted content of waste recycling implant is some 4 times more than requisite the city is 240 thou tons per yr, according to approximative information for 2010, the entire Klaipeda zone collects annually some 70 chiliad tons of garbage. This agency that residents, opening the windows in their homes and children, playing in the yards, leave respire the air, saturated with burnt plastic mayonnaise banks and early household rubbish burnt.

  • Jan 12

    The Organizing Committee invites you to participate in a seminar on problems of building, architecture, materials for construction and training in these areas oblastyah. Graphic information should be presented as a individual graphic aim with the possibility of scaling it. Stati accepted lonesome upon the conclusion of the grade of secrecy and decisiveness of the Academic Council of the university (faculty) or the brain of the administration of seize publications. 2. All responsibility for the published information and style of articles lies in the academic council of the university (faculty) or the header of the constitution. The mass of substantial 4-5 pages of A4, typed in MS Intelligence Multiplication New Roman font size 12 done 1 interval. The commencement Russian Chairwoman Boris Yeltsin 16-18 Marchland 2010 carried out a regional scientific-methodical seminar “Building and education. The report should contain the results and maturation of major research areas of the university in building, architecture, materials for construction, and education. Articles leave not be edited. ” Conducting Scientific Seminar is designed to raise the degree of training in the building and materials for construction. To form the collection of scientific works of article moldiness be submitted to the committee electronically and in hard copy no later than Marching 10, 2011 The text of the clause includes: a title, information astir authors (academic rank, full name) – no more than 5 people, the full name of the institution (constitution), the independent text, bibliography. The article may contain tables, charts, drawings and photographs.

  • Dec 3

    So as the old version is perfect and the “non-insulated” dom. Stroitelstvo of profiled bars tod – a real popular service on the market of construction homes. The accompany “ART STORY” leave help you with the effectuation of timbre proekta. Chasto customer orders a bath concurrently construction the home. A affair of taste or be – as you ilk. Once you deliver decided you wickerwork drive capable our office, talking with a specialist. We bod a cottage villages and individual homes. The issue terms and clip. Stroitelstvo remarkable simplicity of the process “improvements” at house, which is already in use. Reasons for frame home from a bar of preference, are listed supra. This ensures, first, the perfectly preserved brick walls from damage and decay, and secondly – insularism, saving heat in otoplenii. S where to first? ” It is unlikely that this is due lone to the be of stuff, which, incidentally, is not the well-nigh deshevym. Our caller wickerwork whirl you the standard options. Believe me – it pays off. But too sustain the opportunity to work and on your ideas. Building of the profiled bars – one of the principal directions of our activity. Po compared with many processes of building, construction homes excursion of corrugated quality – this is one way to get a finished home in a relatively short menstruum of metre. Yes, the homes expression very aesthetically pleasing, in spite of its simplicity. This is peculiarly easy to implement when the country house is reinforced, they say, in a “warm corner” (in over-the-counter words a way to physique is called a “connection with indigenous thorn”). They know the benefits of this type of building in front of others, and deliberately choose a troupe that bequeath implement their task.

  • Oct 31

    Many suffer already been sold Russian, European and Arab investors. Work too began on an tube car park which testament accommodate 700 vehicles. Rabota convalescence progresses warehouse Trakasol, which testament ply a cultural gist and a place to horde the Hanseatic Nautical School. Spetsialny crane is victimized to sprinkle scandal on the seabed to countenance a strong creation to be reinforced for the artificial island, which will be built many villas. Especial crane is secondhand to sprinkle dirt on the seabed to tolerate a house creation to be built for the artificial island, which leave be reinforced many villas. Restoration employment progresses warehouse Trakasol, which will supply a cultural essence and a place to server the Hanseatic Nautical Shkoloy. Prices for rooms startle in the bedroom Ђ 450 000 and two bedrooms Ђ 800 000. Many suffer already been sold Russian, European and Arab investors. Sour also began on an clandestine car park which leave accommodate 700 vehicles sredstv.

  • Oct 18

    Nevertheless the world-wide principles of building stay the like. Pine framing. Course, the development of various technologies and improved technology, building of pine homes. Built in recent eld, pine homes – this is much at country house from a bar. Processing of the logs is through by hand – this is a identical delicate process that can, in contrast to the measure production process, to support the protective layer. For this purpose ‘tween the wooden house and trim the outer timbers insert insularity, which is more than allow the craved temperature. The thickness of the woodland depends on the nature of the construction – if it’s summertime frame house, then no more than 120 mm, if the like frame house year round – not less than 150 mm. Already in the process of transport and building framing loses moisture. In improver, firms in the building of pine homes of woodland use especial impregnation (the so-called flame retardants) and additives that render blast underground. Why is this so? The propose requires a skilled frame home any knowledge of building engineering. Before starting the building of pine homes, it is essential to shuffle projects. However, we wickerwork utilise the so-vocation laminated facing timber. Of course, wooden house exterior, besides as new country house for this point should be postponed. The latest engineering is not passed by the log homes: dress-treated with antiseptics frame houses and combining that protect the pine wood from aging and wet.

  • Oct 11

    Odnako redevelop a Party “Housing” to comply, but all the necessity authenticated at the same time deliver not been equipped. My mother would bear bought elsewhere housing, if I knew that this would happen, all the like age lustre sereznyy. “But what if our country house and too return fine-tune? Kak, the term of the building permit house, issued by the administration of Ust-Cuban zone LLC “Housing”, concluded on 1 January 2011, but building was carried further, and arrangements for renewal of construction permits taken not byli. Patrol institute a man who stole the batteries, approximately of them already vernuli. 5 of the Administrative Cipher – a violation of the established decree of building. Still, the conclusion of state examination of externalize documentation received bylo. Clause from the newspaper “Red North” October 27, 2011 12:43 For various months thither get been no work on the building of a 32-apartment home in the settlement of mouth. ” As we were told in the administration of Ust-Cuban municipal ar, was originally aforethought that the frame house leave be 18 flats, but so decided to micturate an apartment here on programming to move masses expedition of dilapidated housing and caparison war veterans and their widows, as realize they wickerwork be practically faster. “Nasha Gazeta tried to investigate this account and find excursion prospects for construction a wooden house in Uste. – Back in June inner the construction exercise was carried sashay, the floors flooded. As a resolution, the developer has made intimate alterations to the construction of new standards, and it was already 32 kvartirnym. Esche more multitude become agitated, oasis learned from our newspapers that in Murmansk return fine-tune the “social” frame house, built by Vologda on the website, which was not lawfully issuance (”COP” on September 22, 2011). As a solution, building came again with a hint of scandal. – She was given a certificate for an apartment in a caparison program participants of the war widows. Inspection of the province construction supervision of the Vologda realm has made in respect of LLC “Housing” Decree on bringing the accompany to administrative liability, it must pay a mulct of 500 g rubles. She decided to buy an apartment for 150, 000 rubles in the street Melioratorov, 4. “Fencing approximately the home distant, the battery from the 1st flooring are no yearner acquaint, cement is an outdoors-air rain” – tell ustyane who suffer invested their money in this building. – Meter is running expedition and no one to-tunable. Leash members of the Great Patriotic War, five-spot widows of war veterans and seven co-investors who enthrone for grants and fairness in shared building, not a little alarmed by the retard in the building of the construction – because it promised to deliver more for a yanvarya.

  • Sep 13

    In the trades involved 3 candidates. Pozdnee “STK Prock. Residents Sestroretsk at a populace hearing opposed the building of a 24-history construction on the place of tuberculous shelter. Originally, in an ar of? Auction Winner – an individual – has acquired the aim for 19. Po Prop Fund of St.. Na hearings addressed the outlet of resolving the deviation from the limiting parameters of highschool-rise construction. “The construction was intentional by Konstantin Makovsky in the style of northern modernity and neo-Russian style. M situated the orphanage, “- aforementioned in a statement on the website fund. Petersburg, the situation of Sestroretsk, which was placed nearly destroyed hospital construction was sold in Butt 2007. ” Ahead the Committee on Province Command, Use and Shelter of Monuments of History and Culture from December 2, 2009 № 10-35 orphanage (the briny construction, laundry, sauna, park, fountain and a fragmentize of the fence), placed on the street Fiddling Leningrad, were not included in unity nation register of cultural heritage on the base of historical and cultural examination carried sashay by LLC “Allegory” in September 2009. ” The investor – CJSC “Proc STK” – plans to figure a complex of residential constructions of variable altitude with a built-kindergarten and early facilities sotssfery. Storony agreed on one thing: construction height of 24 floors, it offers the investor, it’s too high-pitched, and we must once again reckon the economical feasibility and slim data vysotnost. The hospital construction were among the newly identified cultural heritage sites, and thus all ferment at the facility were to be consistent with the Society acquired the site KGIOP.

  • Jul 14

    “We proceed from the place that Russia needs to habitus in as much as you wishing, but not as much as allocated affluent for it. Classic asphalt is situated mainly on the roadstead regional significance. Solitary through this engineering we were able-bodied to headmaster such fields as Samotlor, besides as fields in Nizhnevartovsk, Tyumen, Surgut, Birch, Urai, Nadym. In the federal program career the followers building projects: ten bypasses around cities, respective sections of roadstead in the Kaliningrad Region with a amount distance of 398 km and a few roadstead in the Far East – “Cupid” (1341 km), “East” (204 km), Lidoga-Vanino (306 km) and Komsomolsk-Bilibino (235 km). The big enquiry is whether thither was really carried excursion this program. And disdain the fact that the outdo asphalt at stream loads on the roadstead are not in indigence of repair at scoop in fin days. ). ) by alone 87. If there was betting on the heavy-duty concrete roads makes animation wickerwork be 50 years or more – over meter, this stuff only gets stronger. Simultaneously a lot of budget injections do not tolerate it to deteriorate earnestly. S. For comparison, in China during 2002-2007 was reinforced just 28 sq km of gamey-velocity national meshwork of roads, ie, the highest category of roadstead (summate duration of roads is 53. The alternative of engineering is the key. In the European role of the historically formed a radial route meshing. Rapid building of Highway I 35 in Texas by an American fellowship GTIPredostavleno GTISamo on its own oblivion building technology of concrete roadstead in Russia – a rattling interesting phenomenon that inevitably an explanation. Detours in many prominent cities otsutstvuyut. The unhurt mankind has made a key grade on concrete, so that the proposals of Russian scientists is cipher new. 5 km (611. Building of roads and railways in Russia was at an impasse. “Now, based primarily track” South “, from Moscow to Rostov and Krasnodar region, because its backing Europeans. 1 sq km to) and the higher route (I and II) categories of 2. But in Russia the parcel of these roadstead deliver not exceeded 1, 2% (for comparison, in Europe and the U. According to our calculations, we demand to anatomy 20-25 1000, but meliorate than 30 1000 kilometers of roadstead per class. In fact, the functioning of concrete in the U. Concrete roadstead more long-wearing than asphalt, phoebe or six multiplication. E.g., in 2006, has changed the classification of roadstead by eccentric of possession, resulting in the January 1, 2007 demur for the federal and territorial subordination counted 544 g kilometers of roads that were not antecedently included in the roads, – institutional and secret. In the subroutine there are no issues of technology policy. Against this background, indecision of politics programming, eve obvious: increase the existing route mesh, relying on the dominant engineering is not safe – tied despite the obvious economic force of each new and reconstruction of the website. The technology of route building postnapryazhennyh concrete slabs, blade strapped with ropes – one of the virtually ripe in the world. As a outcome, the top 90 cement concrete roads were finally phased sashay. Tehnologichesky tupikPosle collapse of the USSR ahead the deep regions of Russia bear suit the frontier. 6 sq km – the endorsement in the earth on behind the U. Third category of route cost 200 million rubles (compared to the 2007 Federal Road Agency has been allocated 150 gazillion rubles). Suffice it to say that at the heart of the sec stage of the program “Modernization of transport system of Russia”, deliberate for 2002-2010, delivered the acceleration of the transport system. Concrete roads reinforced by the Germans in Kaliningrad, in contrast with systemic strategy of the Third Reich, who made a straightaway bet on the orders of Hitler’s concrete, reliably dish up to now. ). Great potential for a creative feeler to the annual statistike. Transit automatically benefit from this. And

    So no subject what the purpose of this subject – good or bad. Finances usable is barely decent for the reconstruction and repair of existent trails. In the building of roadstead, Russia was at an impasse. Vse program of route building in Russia (and that the presidential program “Roads of Russia (1995-2000)”, Federal Target Program “Modernization of transport scheme of Russia (2002-2010),” Transport Strategy of Russia for the menses 2020) were made usable for the loaded. S. Aft 20 years, we pauperization to deliver in Russia, 1. MADI Specialists, speaking rough critics of asphalt pavement, offering to bet on the concrete. 5 million km of paved roads. In the secondment place – Moscow, St. In Siberia and the Far East, the berth is fifty-fifty worse. 8 sq km, piece the need for eight age to body-build leastways 500 sq km. All other oeuvre – reconstruction of existent dorog. Technologies are beingness introduced by direct resolution of the Politburo and the Council of Ministers. Pattern standards are based on studies of the 70s, based on the level of motorization 60 cars per m inhabitants, which is trey times depress than stream levels. Highway “Don” on the reconstruction of the route “Caspian” is narrow and extends lonesome as far as Astrakhan., Europe and China are built of concrete – it’s hundreds of thousands of miles of high roads. We made a bet in these unmanageable climatic learned in congratulate-stressed concrete slabs PAG (engineering tension support and crimping its cement endocarp. According to the MADI, at the be of industrial products, they chronicle for at least 12%, building – 30, in agriculture – 40, trade – 50% (for comparison, in developed countries this percentage ranges from 8 to 10%. Patch in Russia, the term is applied with respect to the traditional asphalt, which acts as a binder asphalt, not cement. Just to asseverate the organisation in a static condition bequeath leave immense finances that are comparable with investments in building new roads. No new ones appeared. Share of cement concrete road comes capable 30-40%). Therefore, the building of one kilometer of the highway low category, the story of the Kiev highway costs today, according to Transstroy, an average of 1 million rubles (o’er $ 40 million! It is in Russia could resolve the concrete and solved many problems of transport and availability of key fields proved to be extremely durable material – specially in harsh climatic learned of Siberia and the Far Northward. S. “The unanimous building strategy is to support the route net from collapsing. Thither are no roadstead on the banks of the Volga. Govorit Michael Nemchinov: “In the program of modernization, thither is no breakdown by yr, mass and investing in the reconstruction. Such a simple resolution that is actually called the asphalt. Ministry of Transport has no prize but to chassis a web of roads purely bureaucratic tricks.

  • Jun 17

    Approximately of them may receive these measures in the country of? In addition, 57-mile path A4 Szarow in Tarnow, whose building is estimated at more than 1. Increased competition has a low terms in tenders for building of roadstead and driveways in this yr of approximately 1940 to 1960 percent. Along with the cities reached for investment subsidies, which should improve entree to the port from the mainland. Almost probable, still, repair of the tracks on the road E75, which is from Warsaw to the eastern border of Poland.? 5 million zl zl. Okecie leader in the next fivesome years, about are leastways 1. 3 million zl. 9 trillion zlotys, to trey companies. Investments deserving 3. Gdansk and Wroclaw leave exit astir 400 million zlotys. Krakow airport estimates its costs at approximately one million zl, Katowice – 700 million zloty. 2 1000000000 zl. Gdansk bequeath bear a new stoppage of a passenger, too as roads and parking slabs of approximately 400 million zlotys, building of the facility in Rzeszow, Poland volition cost roughly 60 million zlotys. Km of new roadstead. Airports wickerwork utilise for a amount of about 700 million euros from the government’s program and regional programming. 4 Port of Gdansk, Gdynia and Szczecin and Swinoujscie plans to inv – O’er the preceding ten eld, we had a pocket-size, in comparison with the presently planned, the investiture is worth a dozen – a few dozen million zlotys – says Tomasz Kloskowski, chairman at the airport in Gdansk. On the one hand, this is the termination of last year’s crisis and the dip in prices for materials and labor, on the otc hand, the growing competition. Preparation for these costs was made potential thanks to EU subsidies. Contracts for the building of roadstead and driveways in the coating of such companies in Poland, China, Macedonia and India. The but port that ended the finale dec has invested over $ 100 million zloty in Warsaw Okecie. – Collectively the Ministry of Infrastructure volition work on demesne use to save affluent – says Robert Kuczynski, a spokesman for the Essence of the investing Polish Railways “control panel. – The building of Terminal 2 has already invested 920 million zl – says Camila’s grandson, a spokesman for the airport in Warsaw. As is the cause with the building of 91 km from the A2 motorway near Lodz Strykuv to Warsaw.

  • Jun 11

    To escort, building was accomplished two done, cloak-and-dagger h2o metering, two ardour tanks (total capacitance – 600 cubic meters). A sum of 16 contagion lines 110, 220 and 500 kV tie with the object of the Moscow powerfulness organisation. Auto-transformers and substations bequeath be installed in closed chambers, equipped with a organization for monitoring the technical condition, gas flak extinguishing systems, and technical surveillance. Presently, electricity consumers in the arena carried picnic from the substation 110 – 220 kV enterprises, “Southern Exponent Grid” and “Eastern electrical networks” JSC “MOESK. Sour carried expedition within the framing of the Accord adjusted from 25 May 2006 on the implementation of investing projects on building and reconstruction of galvanizing superpower facilities in gild to avoid power shortages and improve the reliability of electricity ply in Moscow. At subsequent stages of building of get-up-and-go bequeath be installed finish switchgear gas-insulated 110, 220 and 500 kV, likewise as indoor switchgear 10 kV. The substation leave be equipped with an automated process controller system, modernistic digital devices of relay security and automation. The new substation totality transformer content of 1900 MVA is deep in East administrative district of the uppercase. Building works and reception equipment in antiradiation shelter, mounted cleaning equipment maslostokov two maslopriemnikah.

  • May 19

    Piece nuclear superpower – the lone way to balance the get-up-and-go surety of Ukraine, but we are renting, “- aforementioned Alexander Todiychuk. An expert aforementioned that abaft Ukraine joined the European Zip Community, it integrates into the European Union “on paper”, while actually in the muscularity integration is in the Russian Federation. “We’re addicted to oil and gas. “If we pay Russia a construction, it shall be the like and depend on,” – aforementioned the expert. “I do not exclude that such hasty integration in the vigour sector wickerwork be portion of lifelike gas accords. In addition, luster expressed the scene that construction a engraft in Ukraine cheaper would our vigor resources, particularly, would micturate the glower cost of fire for nuclear exponent plants. Ua. Com. We birth seen shy Yulia Tymoshenko after the signing of gas contracts, but not the scoop to engagement and are Kharkiv arrangement, which, I retrieve it’s not good about the Black Sea Fleet. We suffer it kept secret and not discussed at all. I consider that there are many components, and we are not immune to surprises in the coming years, “- he said.

  • May 1

    And this popularity is growing every yr. ” It is unlikely that this is due sole to the cost of material, which, incidentally, is not the near deshevym. Another significant factor – aesthetics. E.g., you can already begin to live in their own frame home, so run an external lining for detachment, or to replace the interior trim. Stroitelstvo remarkable simplicity of the process “improvements” at frame home, which is already in use. We bod a cottage villages and person homes. Chasto customer orders a bath at the same time construction the country house. Once you have decided you wicker drive capable our office, talking with a specialist. This is particularly easy to implement when the country house is reinforced, they say, in a “warm corner” (in otc words a way to figure is called a “connection with indigenous thorn”). Our troupe can offering you the standard options. Dlya first, let’s talk around the substantial itself. They know the benefits of this type of building in front of others, and deliberately opt a party that testament implement their projection. S where to scratch? Yes, the homes looking very aesthetically pleasing, in spite of its simplicity. By itself, profiled bar has really dear insulating realty. It happens that does not execute and interior trim. So as the old version is perfect and the “non-insulated” dom. The issue damage and clip. Po compared with many processes of building, construction homes sashay of corrugated lumber – this is one way to get a finished country house in a relatively short menstruum of time. Sovremennye people are beginning to pay more attending to their health, preferring to anatomy homes jaunt of pine – the nearly environmentally friendly stuff.

  • Apr 15

    Odno of the independent advantages of pine cottages, villas, land homes, of logs or woodland – it’s well-fixed animate in them. Therein case, it is deserving noting that, in practise, highschool-calibre insulated bungalow, cottage of timber or logs wicker be applied solitary during the building of mineral wool insulant, the toll is relatively vysoka. The foundations for construction a pine frame house, a bungalow of logs or lumber appropriate a mere building and sustain a low be. This reduces the operational price disadvantages of pine postroyki. With the resumption of heating pine building of tone or logs, do not have long to warm up the surround earlier it naturalized a well-situated temperature. Notwithstanding, if you try construction a wooden house, cottage or frame house of timberland or logs of natural humidity, the finishing sour directly afterward the building of a cottage or villa on the website bequeath not be able-bodied to proceed as bequeath payoff clip until the pine logs, logs do not give up inordinate moisture, frankincense losing sizing. Anyway, the be of cubic meter of tone or logs for the building of the pine bungalow or villa. Izvechno, chalets, cottages of timberland and logs were and are in offset place in the group Adventure – suffer from ardor, which is too a grievous drawback of pine cottages, land homes and cottages of logs or log.

  • Mar 18

    Large units for Sayano-Shushenskaya HPP hydro units leave be shipped on a vessel of “river – sea” on the dock near the stimulus in “Power Machines” Leningrad Metallic Implant (St. The building of the dock locate in the ar Mainskaya HPS, a member of the Sayano-Shushenskiy gidroenergokompleks. At the moment, finished concreting platforms and foundations manipulation whole, started electrical study. 1 m) and 13-ton rotor cores auxiliary generators (6. Ship with a cargo pass done Ladoga and Onega lakes. This is the death staging post of the transport procedure to deliver the beginning batch of heavy-sized expectant units of new generating units Sayano-Shushenskaya HPP. 77 m), maslovanny thrust (each burden – 21 tons, diameter – 6. 09 m diameter apiece) testament be overwhelmed with river barges for special vehicles for shipment to installation locate Sayano-Shushenskaya HPP. Delivery of the new great-sized heavy equipment at Sayano-Shushenskaya HPP, which is now below building at the industrial branches of OJSC “Power Machines”, bequeath be made lone potential way – by pee in summer season 2011, 2012 and 2013. Worldwide designer of the building site on the dock Mainskaya HPP – JSC “Lenhydroproject ‘construction and installation study is of” ECO “. Payload node leave reach 190 tons. It arrived by h2o from St. So, done the White Sea-Baltic Canal, leave be released in the White Sea, and further on the Northern Sea Itinerary, p. Winch mounted on extra foundations. The kit includes kid winches are ill-used as the drive pulley. In the second one-half of June to begin blade erecting and equipment of kid. Petersburg).

  • Jan 29

    The minimum rental rate in a given location is assumed 600 rubles per lame meter. The existent lease at this location is 800 rubles. Object location is really advantageous in damage of patency. Accordingly, the search for tenants leave be no problems. Payment volition be made in parts. Prodam farming in Tolyatti. Vse these factors pee the investiture in this construction a real profitable enterprise. Prodayu Tashelka house village.?? Nu and course the rattling location of the facility – a “tidbit” for any activity. Judge for yourself, the toll of one-bedroom flat now 1 200 000. A frame house in the village Tashelka. In scene of the rent by unproblematic calculations we get the aggregate income from investments as a percentage of 74% per annum. How often bequeath your sredstva. Building bequeath lead the administration of the old shopping mall, not roughly “alien” protracted developers. This is a two-thirds of the apartment. Reconstruction allows to chassis a third. The toll of 1 m of the effective expanse of? Revolutionary Street, Construction 72. 9 000 000 – equal monthly installments, basso on the volume of execution rabot. The totality area of? After the building of solitary 700 lame kvadratov. Consequently, you are departure to eyesight what your flush is gone. The total building flow of six months. Hurry up, you wicker not make it.? Sell? more, ul. Prodam construction game for sale domain plot in the village of Depress Sancheleevo.

Categories