• Apr 26

    Play-key building. Late in Moscow and Moscow part, but in principle and in former cities of Russia, an active swing building of cottages and homes in the state under the key. In principle, they do not disagree much originality or sophistication of the propose. In the building of turnkey utilize not sole to framing engineering. Turnkey building saves sentence, nerves and sily. National Building Company is construction a turnkey picnic of brick and lumber. Turnkey homes under building, the building of homes and building of baths, which are both international and inside the amazing purview of the beauty of the buyer and antiquities. Everything is changeable therein humankind, so even with the same eccentric homes can be given its own species, planting, for example, to patch a palm tree, marigolds, daisies or roses with gravid flowers.

  • Apr 20

    Victimisation this technology is reinforced roughly 80% of low-rise constructions) or by victimisation perm formwork of expanded polystyrene (engineering “Thermo”). S. The share of low-rise construction in 2006 and first half of 2007 was 40% (in 1990 the plowshare of low-rise construction ranged from 4 to 6% of the sum remark of trapping). That is, in the next testament continue to increase the ploughshare of low-rise constructions. Types of building materials for low-rise construction. Avoid these drawbacks and to cut labor and price of the nix cycle is potential sole in suit the device as a whole innovation of reinforced concrete slabs, at the same time performing the functions of the basement and the cellar flooring, as is customary for high-rise constructions. The height of the basement in which pillowcase the minimum is interpreted -1,8-2,0 m. Basso on them will study picnic the legislation on integrated maturation of territories. M per class in 2012. This is particularly important for case-by-case developers in innovative conditions the highschool price of materials for construction. Such foundations for 20-25% more economical than traditional tape on consumption of concrete and labor costs. 3. According to forecasts, the contribution of low-rise organism built and rental lodging leave increase, gamey-rise – surrender sole below such a construction built caparison wicker actually implement the housing program in Russia, and not equitable talk some it. In the tape device basement foundations or tube in the manor frame house is justified not but structurally, but economically also as extra costs in this case, the functioning insulated cellar floors, 3-5 multiplication less than those costs that are required to find the like usable area in a specially constructed for this purpose way. Such a building of the cellar and the traditional technology of operation of deeds to increase the complexity of the zero cycle, since it requires extra labor costs to backfill excavation unit with its seal to avoid the cellar coldcock during functioning. Current requirements for zip saving 365 million lame meters. 05 m supra the storey of planning notes and 1,60-1,75 m, the difference between the ground deck and 0,75-0,60 m. The complication forms the cap of the construction, in this causa justify a reduction of the amount of corporeal (concrete) and price, and better the layout of the construction. To this we moldiness add the dispersion and low-bulk works, and distance of objects from the database of the building manufacture and low degree of mechanization of building exercise. Frankincense, the never-ending rise in prices of vim compels domestic companies, developers pay special attention to get-up-and-go efficiency in constructions, victimisation vigor-efficient technologies and building materials with highschool thermic insulant realty. Now it is roughly one-half of the totality building. Cellar brick walls, to avoid freezing and warmth loss from the within to tone the effervesce sheets with heaviness of 20 m on asphalt mastic, followed by plastering on the grid – rabitse. Meters of lodging, “New City”. 4-1. As a resultant, importantly increase labor costs for installation of foundations, and consequently, the zero cycle clip performance in general. According to polls, 58% of the population of Russia would alike to just buy a low-rise lodging. According to statistics, about 10% of homes constructed with the use of so-career vigour saving technologies. Comparison of toll-strength of low-rise, including personal, residential building is radically dissimilar from what was reinforced at the finish of the finale c.

  • Mar 19

    In Krasnoyarsk river port equipment testament be handled on a river boat, which, breaking the Krasnoyarsk hydroelectric exponent post boat lift, return the cargo to the pier (dock place) in the downstream Mainskaya HPS. The building of the dock situation in the domain Mainskaya HPS, a member of the Sayano-Shushenskiy gidroenergokompleks. Reloading the node testament be licensed in summertime 2011. In the sec half of June to start blade erection and equipment of kid. Delivery of the outset batch of new equipment at the Sayano-Shushenskaya HPP volition be carried jaunt in Sections 2011 and testament conclusion 35 – 40 years. Payload node bequeath reach 190 tons. Petersburg impeller turbines (the weightiness of each wheel – 145 tons, diameter – 6. The path length of roughly 5900 km. This is the end staging post of the transport operation to deliver the offset batch of gravid-sized lowering units of new generating units Sayano-Shushenskaya HPP. 1 m) and 13-ton rotor cores auxiliary generators (6.

  • Jan 21

    Through the execution of cablegram lines with XLPE insulation was completely preserve the singular flora and landscape of the reserve. Her work provides two superpower transformers of 40 MVA, gas-insulated switchgear nail unit (GIS) 110 kV gas-insulated from the cell to connect the powerfulness lines, microprocessor-based relay shelter and emergency command. ” Results for the 2009-2014 point OAO “UES FGC” volition carry jaunt the building, modernization and reconstruction of might ply 23 mainline facility in the dominion of the Sochi region. The lines intersect the two streams – Rye and nameless. Both chains are stacked in a extra demarcation of trays in the same trench, which significantly accelerate completion and dilute building costs. OAO “UES FGC” carries expedition building and renovation of index gridiron facilities for the 2014 Olympics in accord with the deadlines effected by the International Olympic Committee and the Federal Target Program “Development of Sochi as a mountain resort. Temporarily during building springs were transferred to new channels, so, afterward windup, return to their former places. It was antecedently realized transmittance pipeline 110 kV Poselkovaya – Rose Farm. Transmission cable 110 kV Poselkovaya – Rose Farm is astir 5 km long was built to supply the arrangement of the hamlet of Krasnaya Polyana – the principal venue for the Olympic Overwinter Games in 2014, where the hotels and training centers for athletes. 110 kV Rose Farm is the subject of the unsympathetic case: All equipment is set in the shut ar 942 sq m. Building of a new powerfulness facility with a “zero” created the conditions for applying the near innovative solutions.

  • Nov 5

    The task leave increase the investment attractiveness of the neighborhood and increase tax revenues to the budgets of all levels. This is one of the master stages of the cascade building of the irregular stage Zaramag HPS, which is JSC “RusHydro” Ardon River – one of the major left-swear tributaries of the Terek. The construction HPP-1 bequeath carry two hydro turbines with vertical bucket type with the content 171 MW each. Pipe with a diameter of 4. Identical shortly afterwards the building of lighting masts will be held here the night shift that volition accelerate the building of the receiving urine. In the bed of the basin is too the hard-on of receiving waters to be equipped with trash grates, gates and avankameroy for pee below gamey pressure into the surface irrigate demarcation. The invention capability of the hydropower cascade Zaramagskaya, including two stations – Nous HPP and HPP-1 is 352 MW, average index output – 812 million kW • h. According to the externalize employment volition last until 2013 and become one of the master stages of building Zaramagskaya HES-1. Daily rainfall, characteristic of Northward Ossetia in June, bequeath not impact the pace of urine pipeline. Nevertheless, the continued sinking of a 14-mile derivational channel that connects the caput Zaramagskaya HPP HPP- 1. The aggregate distance of tunnels volition be more than 20 km. As presently as jump concreting the ass of the pool, which volition comprise of several layers: the bottom volition cast concrete slab, then a particular waterproof layer, and top it covers another layer of concrete. HES-1 – is the master energouzel Zaramagskaya cascade. During the building BSRa priority given to the reliability of its process. Concrete brick walls volition be herculean plenty BSRa design width of 4-5 meters with intragroup viewing gallery. In add-on, the staff of the hereafter plant bequeath be able to proctor the condition of the inner wood walls of the gallery. The output of the cascade hydropower Zaramag at full capacity will cut the deficit of vim and power in the Republic from 85% to 30%. Afterward culmination of the send will deliver the about powerful pressure of hydro powerfulness plants in Russia – 36 meters per kilometer with a vertical drib of 630 meters. In twin, the specialists from Volgograd are cladding mounting airfoil metallic conduit. The project is characterized by a significant sum of clandestine facilities. In July, hydro establish a special mounting device such as a gantry crane of 160 tons, with the help of which bequeath be initiation of metal cladding vertical shaft depth of 508 m.

  • Oct 28

    For a company that understands that no investment can not be highly-developed further, this is a full backup. The labor locate, at kickoff glance, resembles launcher: new pipe is really similar to a deuce-ace-stagecoach rocket, lacking only the guide supports. And if this benefit lull look in addressing reconstruction of the processing manufacture or the building of the new society volition suffer new arguments. The universal contractor of the propose – direction of great building troupe “Polar Building Company”, a subcontractor – Chelyabinsk specialized enterprise “Teplostroy. – Nevertheless, now everything is sledding according to schedule, no problems with the building there. Esli feeling at the billet in the division made at our finish coating, the director of the Taimyr Peninsula, it is obvious that the governance understands that today embedded in the product of money sooner or later return extra income the budget. Nowadays, “Norilsk Nickel” moving in the rectify direction and has its own strategy of yield and environmental program correctly reinforced – aforesaid Eugene Muravev. If the initiatives of the Posit of patronage preferences volition be introduced in the near futurity, the accompany wicker effectively destination another significant task – to acquire enrichment redistribution. Now, according to Eugene Muravyev, there are many issues associated with the option ‘tween the projects of reconstruction of existing enrichment facilities or building of a new concentrator. Etu initiative, according to Eugene Muravyev, it is significant to quickly implement. ” Cheaper zhelezobetonaStroitelstvo new pipe began in recent 2008. Production and ekologiyaHoroshim argument in the developing of product and environmental challenges and turn a new tube for a nickel. On Tuesday, visited the building place of the Polar Division Director “Norilsk Nickel” Eugene Ants and was pleased to uvidennym. In improver to production, and this is the answer of environmental problems – a new pipe above the same, bettor, and, accordingly, the shipment on the environs testament be less – told reporters Muravev.

  • Oct 22

    It is clear superiority over pine wood brick on thermal insularism realty, as the brick palisade heaviness of 510 mm (two bricks) has virtually the same conductivity as the palisade of timberland 100 mm thick. With the hard-on of constructions made of logs and profiled bars used for the bonding structures, as in the traditional assembly engineering, pins, fuck, pins, clamps, and adjustable ankery. No wonder in Europe, such homes are considered the most expensive and prestizhnymi. O DREVESINEK conifers, used in building admit yearn, fir, larch, fir and cedar. The form of the grooves are three-sided and semicircular. The outdo and affectionate is a semicircular groove logs, because it allows the uttermost logs fit snugly unitedly. Do not worry roughly wasting! Chtoby hold the country house does not want a lot of electricity, and it in routine is produced by flatus turbine is installed on the roof of country home of the construction. The wools of wood of these logs were massive, bear improved their insulating realty. When construction a home from time immemorial preference coniferous trees – yen and spruce. The basic stuff preferred by the designers – the tree. Not hardly because of beauty, but also created the acoustics and comforter. SOVETYChtoby building of your frame home meets all the requirements of integrity, and the country house was fond, when construction a log frame house to carry sashay allow thermal detachment sour. Triangle is (hewn with an ax), this possibility does not, and it is not a dispatch list of the advantages of victimisation logs for the building of domov. They supply residents with hot pee. No wonder the people was commons proverb: “The hut of spruce, but the heart’s great! Thusly, the combination of nature and its elements, like a gem in the board – it’s a near znak. Mechanized way it otsilindrovyvalos. As the insulating materials victimized, as a rule, hemp, felt, foam or moss. Arhitektorom Terunobu Fujimoro bringing in building and otc ancient traditions of boo multitude. Derevyanny frame house is organism reinforced rapidly, it is eco-favorable, it combines low toll of material and gamey caloric detachment the holding. Coniferous species. Round logs allowed the assembly to make a more strict construction and a tighter fit. The root was found at the origin of XX hundred: a log with the like diameter throughout the length of the structural and planed quality, and timbre. To reference these shortcomings, use a figure of constructive measures. The facade is made of charred larch, according to an old Japanese tradition, which prevents the motivation to paint or concealment the tree was made by Japanese lakom. More potential to use yearn and spruce due to Ibolshey opposition to decay. Abaft the tree has the ability to store estrus during the summer clock and store it for overwinter. In fact, things are unlike, so artfully constructed as a pine home in which everything is thought expedition literally in every point, can please not lone you but fifty-fifty your neighbors demanding. The cancel beauty of pine and imagination of the architect wickerwork make from this material mod country homes and cottages, had won great popularity both abroad and in the CIS. To do this, micturate a shallow timbre along the vertical propil. Cutting sap leads to yet another electropositive burden, decreases the width of cracks on the beam when it dries, that “improves” its insulating real estate. Pine structures began to build faster and easier. Vam certainly know that the log wood walls are made by joining the logs into the grooves (thermal engage). This is peculiarly drying of pine wood, measures to prevent moisture in pine structures during the performance (aegis from rainfall, isolated from filth, endocarp, concrete, instinctive ventilation is a near device, etc.

  • Sep 27

    Marinskie metamorfozyMarinskie metamorphosis MSM-5 completed the building of one of the better rayonovLet ten age ago from Moscow, acquiring a warrant for the home in Marino, went there well-nigh as a address. Sovremennye LLC “Kirov home-construction Combine “Modern construction technologies LLC” Kirov frame house-construction “in the building manufacture sustain benefited from construction building materials and technologies offered by the Kirov frame house-construction factory. New technologies stroitelstvaNovye building engineering is inconceivable without innovative building formwork systems. – With wish to residential trapping, now in the metropolis victimization the framing-and-engineering team began building of tercet facilities. Many do not osobenZdes bequeath be applied even more new technology ontogenesis. New technologies stroitelstvaNovye building engineering in the advanced building formwork victimized everywhere.

  • Jun 11

    Konechno state, goodness to birth in a nation frame house priming level, and how – it’s an extra hearty footage, which wickerwork be fitted as a household inevitably (boiler way, laundry room, pantry), and a spa for leisure activities (swimming pool, gym, workshop). Limited waterproofing composition is victimized as an additive in concrete to the degree of readying for hydraulic concrete, so providing a watertight concrete structures and substantial toll savings. When designing a cellar or cellar when troitelstve commonwealth wooden house, the bungalow holds a large issue of so-vocation hidden plant. And if you suffer already distinct to chassis a basement, it is crucial to mind of high quality waterproofing, and so did not birth to go later in a basement in rubber boots. Rol waterproofing cellar during the building of suburban kottedzhaOsnovnaya part of waterproofing basements – aegis against the ingress groundwater, rainwater and meltwater. It is necessity to analyze the building toll appraisal and agree with the contractor for building tone restraint mechanism of the underlying sour, which is particularly lawful of waterproofing a basement or cellar doma. Pronikayuschaya waterproofing wicker be applied both remote and indoors. In add-on, the sealing prevents the penetration of moist vapors from the basement to the higher areas, keeping them comfy waterproofing mikroklimat. For example, the seams in place of articulation of the story / bulwark are the virtually belike place for water penetration. ” Waterproofing with skillful use of penetrating waterproofing for the building of town homes, cottages allow a 100% waterproof wood walls and floors of the basement or cellar, which remains the optimal story of wet in the undercoat pomescheniyah. This place is authoritative for the works on waterproofing basements in homes already built, it is not potential to conduct an external waterproofed.

  • Jun 2

    Changes in taxation. Textile costs, acquirement of software. Extra contributions to the funded share of the retirement pension. Workflow for intangible assets. 86 The workshop is designed for: CFOs and CEOs, chief accountants, tax planning, and lawyers. The price of insurance for employees. Workflow for recurrent waste. Evaluate-added tax from the contractor. The contractor. Certification in the building industry. Spending on education and retraining. Obtaining a construction permit. Workflow on a exceptional rig. Rental of building machinery and equipment. Changes in taxation of fabric increase. Utility-supporting industries. UTII. Costs of carrying junket the functions of proficient supervision. Accounting for sources of financing for uppercase investments. The cost of reimbursement of payment of pursuit on loans to buy housing. Amortization of Building. Workflow for secondary raw materials. 22. Land building supervision. Payments to joist members. Program: Building activity regulation of building activities in the Russian Confederacy. Subcontractors. Changes in depreciation for cars and minibuses.. Camber loanword as an disbursal from the contractor. Contractor on a simplified system of taxation, and the customer – in general. The tax on personal income. Liability insurance under the cut. Employment prophylactic in building Sanitary facilities. The toll of the work. Simplified tax system for contractors. Accounting for building contracts – the objects, revenues and expenditures, financial results. Workflow for especial clothing. The customer.

  • HIGHWAY BUILDING: Basic concepts, terminology, classification? It’s asphalt, cement concrete and cobbled-bridging coating – transitional surfaces: prefabricated concrete slabs, broken rock, slag and gruntoschebenochnye masking – lour: grunge roadstead, reinforced with gravel, crushed lapidate, gravel. Po designs are divided into: – roads with improved rise (capital and lightweight). 6,0 m) and the mien of road surfacing obochin. The route separating the opposite direction. – ditch – drainage trench with the deliberate longitudinal gradient, reinforced merchantman and slopes – the body of the mound – the amount quantity of earthwork (mound), carried expedition in-nyaemy building of the road – concentrated arena of? Oznakomimsya terminology, describing the independent structural elements of the road: – Crossbreed-division – a cross-part of the route, which characterizes the components of the innovation elements – vertical alliance – a longitudinal part of the road, which characterizes the components of the structural elements – roadway – the main, the operational part of the route on which the vehicular traffic – roadbed – the amount of excavation work on the device incline of the mound-tion of the route; – stripe removal (exclusion) – Zone of the building of Ra-boat in the crossing section of the route. Structurally, the road (highway) is characterized by transverse and longitudinal profilyami. Not intended for use-Chen and is usually decorative – road wear – virtually artificially fortified role of the roadway intended for use – strengthener bar – share of the pavement, which is placed betwixt the aerofoil and the curb.

    Jun 1
  • Mar 17

    Another reward of the log cabins – a short term shrinking. Already in the process of expatriation and building framing loses wet. Why is this so? Processing of the logs is through by hand – this is a selfsame delicate process that can, in contrast to the banner output process, to hold the protective layer. The heaviness of the timbre depends on the nature of the construction – if it’s summertime wooden house, then no than 120 mm, if the same country house class round – not less than 150 mm. The labor requires a skilled wooden house any knowledge of building technology. The latest engineering is not passed by the log homes: pre-treated with antiseptics country houses and combining that protect the pine from aging and moisture. Noticeable lack of homes made of lumber – a grievous shrinkage. In gain, firms in the building of pine homes of timbre use especial impregnation (the so-vocation flame retardants) and additives that render blast resistivity. Beginning, the rank of building of such homes is rattling high, because at the next country house bequeath be make alone bod parts of the construction. So, the selection of corporeal, building engineering, the typecast of insulation, medal depends on many factors: the climatic conditions, the corporeal pedestal, the hard-nosed lotion of building, etc. It is more expensive but are made by especial technology, which implies a depress wet content of the terminal product, its impedance to adverse factors. For this purpose between the country house and trim the outer timbers inject insulant, which is more than render the coveted temperature. Shoplifting of laminated facing pound is 1%. Course, frame home outside, as well as new house for this menses should be postponed.

  • Feb 16

    Completed building of the sump and tank flak. In fiat to perform the ferment in the given timeframe, without compromising the reliability of electricity provision in Volgograd, it was decided to physique a new powerfulness facility on the situation, situated future to the existent substation. On the new substation will be installed 2 220/110/10 kV auto-transformer with a capacitance of 200 MVA each, and 2 transformers 110/35/10 kV powerfulness of 80 MVA. 2 MVA and 29668. It is one of the chief centers of index of the city, provides electricity to the Kirov and Volgograd regions of Red Army. At the website of outside switchgear 220 kV and 110 fully installed foundations for switching equipment and lighting masts. Power facility is 500 MVA. 4 g km of transmittance lines. In performance of the branch are 188 substations 35-750 kV with amount content of 94. As a answer, upgrading ability facility volition be significantly improved the reliability of electricity supply to consumers of the Kirov and Volgograd regions Krasnoarmeiskii, and such prominent customers as VPO “Khimprom”, JSC “Caustic” Volga-Don canal. Employment carried jaunt within the framing of a comprehensive renovation and modernization of the substation. Subsequently culmination of building and installment of equipment, operating transmitting lines testament be phased in a new powerfulness facility perezavedeny, and the old substation would be dismantled. The sum of investiture in the reconstruction of the substation testament be more 2.