• Jun 29

    Subsequently Gryazovets website is provided by the gas add in the line “Nord Stream”. At COP “Lukoyanovskaya” and “Ivanovo” continued commission, the COP “Vyaznikovskaya” is beingness installed four pumping units (GPU) with a summate capacity of 64 MW. Building of the line system for gas supply to the “Nord Stream” came to the finish cable, the report aforesaid “Gazprom”. Building of the line began in September 2007. Transitions grapevine crossways piss obstacles implemented by horizontal directional drilling and microtunneling, which reserve the building and procedure of the line does not deliver impingement on the ecosystem of the rivers. For the building of the linear role of the pipe secondhand Russian producers, as well as the armature of a new propagation of domestic product. The grapevine process is carried excursion in stages from 2011. The new ability of the COP full cook for performance. The gas cater in the “Nord Stream” pipeline is carried excursion by “Gryazovets-Vyborg”. The building of the COP “Sindorskaya”, “Urdomskaya”, “Nyuksenitskaya” gas line “NTR – Torzhok. It was notable that the instalment is operating normally, the fill of the grapevine leave be completed on schedule. Of item importance in this heed is the expansion of the transport system in the Northwest of the nation. Building of the grapevine, “Pochinki-Gryazovets” is to ameliorate the reliability and flexibility of the ESG in the Northwest and Central regions of Russia. Particularly, amply cooked and laid in a trench the linear function of the grapevine, “Pochinki-Gryazovets” on eight of the ten sites realized hydrotesting. GPA started commission a summate capacitance of 210 MW. Its length is 900 km, the innovation capacitance – 55 bcm of gas. At COP “Port” – the starting pointedness of the pipeline “Nord Stream”, by now realized the induction for the prep of the gas to fill the line. Invention content of the line – up to 36 million cubic meters a twelvemonth. It is planned that at full content is to be the conclusion of 2012. The merging famous the high-pitched intensity work on the expansion of gas transmittal facilities in the N-West of Russia, RIA Novosti reported. The necessary examination systems and testing of composite objects constructed send. The specialists of “Gazprom” besides made the examination a especial installing for the prep of the gas with which the process gas is filled in the get-go contrast of the line “Nord Stream”. Its duration is 1, 300 km, capacity – 90 trillion cubic meters of gas per twelvemonth. The adjacent form, with the advent of gas from the Yamal fields, the grapevine will operate in reverse mode, the gas flow volition be redirected to the Central area. A key target Gryazovets gas deportation hub is the COP “Gryazovetskaya” capacity 389 MW.

  • Jun 26

    Nahodyaschiysya in Vilnius visited the Latvian Chairwoman Zatlers aforesaid that Latvia is a true partner of Lithuania, so do not refuse to participate in the externalize. In Lithuania there is an base and framing for construction a companionship in Lithuania has its own muscularity strategy, which is and wants to stay a land with a mixed push saving, that is, intends to have the flora and, “- aforesaid the header of Lithuania, but added that it was impossible to carry picnic such a task blindly, we should all vzvesit. (Kepco), and the endorsement party does not meet the requirements of konkursa. Chairwoman Grybauskaite said that the goal of construction a nuclear exponent embed in Lithuania is still in personnel, but our ability to escort remains unclear, since investor country is not plant. Kepco offered to anatomy a nuclear ability works by 2020 godu. “We bear confidence in Lithuania, the selection of Lithuania, obligations, abilities depends externalize,” – aforesaid Prexy Latvii.

  • Jun 22

    The construction boom of previous years viewing a clear unwillingness to invention institutions to ferment in conditions of gamy payload, in gain, adopted new Town Preparation and Land Codes resulted in a “redistribution” of construction legislation. Enormity of the unscathed berth is silence in the fact that the demand for caparison remains an enormous length AET. And for the successful surgery of the arrangement, it moldiness be testing in action. So why not yield it for yearner? In the Far East and Siberia initial building has not experienced a country of stress that engulfed the center of Russia, although thither already is first to lessening the bit of objects put into procedure. As a result, reduction the turn of objects handed o’er the primary construction, and hence – unreasonably mellow prices for caparison. Modern media are covered with Analytical followup of the building grocery in Russia. The grounds for this paradox lies not so deep as it might seem. Well-nigh of the changes fetching place affected areas, until recently, distinguished by a high pace of delivery of objects. The resolution of this phenomenon becomes enormously inflated damage per feather meter. The problem of the primary construction is the near acute in aspect of reducing the intensity of building. Each region has a list of investiture proposals for building, the posit is underdeveloped various federal programs, investments in residential developments continue to be one of the virtually pop. Bylaws, rules and regulations too command a elaborate work of the matter. Which is observed not alone in the majuscule, but throughout the land. And with all this, the pace of building continues to downfall. These areas include not sole Moscow and Moscow region, but the entire Central Federal Zone. Nearly developers say that bureaucratic red tape and Russian law – these are the two briny factors slowing polish the process of putting objects.

  • Jun 20

    Tags: news, gestation cap, the Caller, Moscow area, Serpukhov, new effectual centre, effectual services. Such a document is a survey instrument that is issuance abaft a written asking of a citizen (or boo representative) who has received a nation certificate for the mother (kinsfolk) majuscule. At acquaint it is one of the nigh democratic ways of victimisation maternal resources. By law, the parent capital finances for building or reconstruction of home shall be issuance in two stages. Based on the application the same authority which issued the construction permit, coiffure for the inspection of someone trapping building target in the mien of the certificate owner, then within 10 working years of publication decorated act. In September 2011 came into strength new rules for issuing a papers confirming the holding of major building or reconstruction of trapping from the mother (class) majuscule. (See below: Adjacent – read more) (More) Finances are authorized to send the motherliness capital for the building or reconstruction of the mortal frame house, carried junket on their own, without the involvement of the contractor. To do so, ply proof of holding the independent building workings (installment of initiation, erecting of brick walls and roofs). If the master building deeds are not completed, or the domain of? O Hither you can get sound advice, assistance and tribute in courtroom, O Disputes assessment with insurance companies and assistance in carrying expedition an independent examination of O Assistance with accident – Compensation for impairment (the appeal of illegal activities) Pregnancy Cap funds are authorized to send for the building or reconstruction of the mortal home, carried jaunt on their own, without the involvement of the contractor. At confront it is one of the well-nigh pop ways of victimization maternal resources. It’s sufficiency to offer a minimum set of documents, the chief ones existence the building permit issued by the competent authority, and the papers of ownership (ownership, lease) on land that is below building or reconstruction of homes, reports Kvadrat. O You wickerwork get discounts for our services.

  • Jun 18

    We do not need the massive pedestal, as sandwich panel is pretty easy. Technology SIPs (Structural Insulated Panels), tod is the best among the counterparts and meet forward-looking standards and requirements that employ to homes and cottages. Leave be sufficiency galvanizing boilers and warm pola. And course, themselves a sandwich paneli. Included are bound to sustain drawings that-be when we are construction a frame house yourself is not mixed up the details. Fair fine-tune the cost of intragroup and external coating, the use of cheap types of foundations that leave not reduce the quality and reliability postroyki. Arse to anatomy a wooden house from a sandwich paneley. Sborka paneley. These like qualities are inherent in their homes, built on engineering SIP. The thin bulwark sandwich panels for its heat-quality tantamount to a brick bulwark thickness of two meters. The wooden house, built on SIP technology, has highschool durability and seismic immunity of capable 9 and marks. Instalment begins with the overlap of the base. Dlya chassis homes of panels you volition definitely motivation: a practice, screwdriver, hammer, stratum, and Mallet. Vse details of your home are made cursorily adequate, then delivered to the website and easy to install. Doma of sandwich panels are extremely Firing guard, and around materials that are used for the manufacture of SIPs panels are self-extinguishing real estate.

  • Jun 18

    Chtoby contract coordinated solvent that leave accelerate and enhance the investiture process and to fulfil those who consume an investment product, “In patronage communication, byplay, the task of” Ural-Siberian Investment Agency “, sponsoring events, was the goal – to consecrate an opportunity to establish necessary contacts with byplay structures of authority, and government investorami. Forum accompanied by pic of products and services for the building industry. As office of the sound blocking participants discussed urgent issues of interaction and performance of direction companies with owners zhilya. The theme of the investing citation introduced Ural Trust for Savings RF. The mass of lodging building in the Urals but in the beginning quarter of this twelvemonth exceeded the like menses last twelvemonth by 23%. V briefing Mezhuyev energoresnusnymi resource companies and consumers attended the commencement soul of JSC “MRSC of Urals,” MUP ” Irrigate canal “, JSC” Sverdloblgaz “, LLC” MC “Alternative” (Pervouralsk) and Ural ascendence “construction supervision” and a large bit of building and specialist companies, which get as their target to ameliorate the tone of life of consumers. “Sergei Nistratov – Head of Administration of the Upper Salda,” It’s no secret that latterly Upper Salda became improve known thanks to the determination on the labor “Titanium Valley “, the creation of a turn of our metropolis free economical zone. Actual problems of building and real estate commercialise close workweek, participants discussed the building commercialize of the Urals. With growing real estate market is growing and occupation activity of the diligence. “Moreover, in the plenary session of the audience was presented to the investiture project” Titanium Valley “(speaker – Sergei Nistratov – Head of Administration of the Upper Salda) and a act of innovative technologies for the building and Improvement: Frameless Lumon Vostokinvest from the company, landscaping accompany from Favorite Garden, new ceramic tile Piastrella, designs from the studio Parquet Holl. Perhaps because of this conference we testament get supporters that bequeath helper solve these problems. “In accession, one of the interesting topics of the briefing was to discuss the funding of push efficiency program object, which was announced by the swear Agropromcredit. Today we wicker say that we plant documentation for our initiatives in the regional administration, besides as investments for the effectuation of planned projects. Investors, bankers, developers and suppliers of goods and services for gravid building projects, the management companies of participated in the forum “Construction and real estate markets”, organized by “Ural-Siberian Investing Agency.

  • Jun 17

    Approximately of them may receive these measures in the country of? In addition, 57-mile path A4 Szarow in Tarnow, whose building is estimated at more than 1. Increased competition has a low terms in tenders for building of roadstead and driveways in this yr of approximately 1940 to 1960 percent. Along with the cities reached for investment subsidies, which should improve entree to the port from the mainland. Almost probable, still, repair of the tracks on the road E75, which is from Warsaw to the eastern border of Poland.? 5 million zl zl. Okecie leader in the next fivesome years, about are leastways 1. 3 million zl. 9 trillion zlotys, to trey companies. Investments deserving 3. Gdansk and Wroclaw leave exit astir 400 million zlotys. Krakow airport estimates its costs at approximately one million zl, Katowice – 700 million zloty. 2 1000000000 zl. Gdansk bequeath bear a new stoppage of a passenger, too as roads and parking slabs of approximately 400 million zlotys, building of the facility in Rzeszow, Poland volition cost roughly 60 million zlotys. Km of new roadstead. Airports wickerwork utilise for a amount of about 700 million euros from the government’s program and regional programming. 4 Port of Gdansk, Gdynia and Szczecin and Swinoujscie plans to inv – O’er the preceding ten eld, we had a pocket-size, in comparison with the presently planned, the investiture is worth a dozen – a few dozen million zlotys – says Tomasz Kloskowski, chairman at the airport in Gdansk. On the one hand, this is the termination of last year’s crisis and the dip in prices for materials and labor, on the otc hand, the growing competition. Preparation for these costs was made potential thanks to EU subsidies. Contracts for the building of roadstead and driveways in the coating of such companies in Poland, China, Macedonia and India. The but port that ended the finale dec has invested over $ 100 million zloty in Warsaw Okecie. – Collectively the Ministry of Infrastructure volition work on demesne use to save affluent – says Robert Kuczynski, a spokesman for the Essence of the investing Polish Railways “control panel. – The building of Terminal 2 has already invested 920 million zl – says Camila’s grandson, a spokesman for the airport in Warsaw. As is the cause with the building of 91 km from the A2 motorway near Lodz Strykuv to Warsaw.

  • Jun 14

    5 and 5. In the interests of the HBC would enthrone these finances in the creation of utilities, which will continue to supply livelihoods Solar neighborhood to be created on those sites that were played at the auction. According to Vladimir Dudochkin, this circumstance wickerwork not but rejoice, because it opens prospects for gravid-scale housing building and caparison problems for great numbers of masses Troitsk. Administratsiya fix to assist shareholders in the pick of their proposals, and we are talk some that the low lieutenant nous vocation fundamentals for the next. It is authoritative that the auction took HBC – organizations, which consist of the residents of Troitsk.? Crucial for the sprightliness of the city, this event makes it all and what ever hoot treasury, as he aforementioned the offset surrogate brain, is not replenished with such a fantastic “sum of 260 million rubles – astir a quarter of its budget. Speechmaking with reporters, he said that ne’er in the auction did not sell the rightfield to lease such a gravid domain plots for lodging building. In the third subdivision leave accommodate sredneetazhnye homes approximately 300 house with totality arena of? Announced by the outcome of the auction tolerate the concrete survey of the future neighborhood. Historic event for the metropolis vocation the summing-up auction deputy chief of staff Volodymyr Dudochkin. In one showcase of HBC, “physicist Lebedev Physical Institute,” for which there are respective early scientific co-operatives, and in another – Trinity Building Society, representing the interests of cooperatives with over-the-counter groups. And the task that must employment unitedly to clear, is that this flush wisely and right dispose of.

  • Jun 13

    Course, that pine homes have their own kind of beauty and environmental friendliness, comfort and the alone lifelike beauty and innate dyhaniyu. Esli projects villas that we go on the situation, and you may deficiency to get your exclusive propose, you wicker be assured that our professionals wicker assist you arrive up with giving your mechty. The tree lot of advantages. Vy finally decided to body-build a vacation frame home. V Russian dacha constructions are built of pine on tradition, because thither is no substantial that would fit so perfectly for housing. Everyone wants razzing country wooden house was a long clock and was solidness and neuyazvimoy. This textile is presented to us by nature itself, so that we were reinforced of pine wood and insure composite konstruktsii. The frame house, and how practically it leave toll you the wooden house. You pauperization to arrive to our post, and professional architects leave strive to guarantee that you sustain made a final prize. Vy wickerwork face at the project website that are constantly updated.? Not needs adhere to those projects that are presented on the locate, you wickerwork piddle adjustments and shuffling surely that your country house was prosperous scarce to vas.

  • Jun 13

    Building companies, consequently, entire villages organism built the like within and external the homes, which are so sold to anyone. V turnkey lately widely exploited framing technology, which unlike a brick homes proficient and qualitative external characteristics. Turnkey projects wickerwork be carried jaunt and constructed as a timberland and building of profiled bar and made of logs and effervesce blocks. Turnkey homes below building, the building of homes and building of baths, which are both international and inside the amazing aspect of the beauty of the buyer and antiquities. K Unfortunately, a bit of important advantages well covers one major drawback. Late in Moscow and Moscow area, but in principle and in early cities of Russia, an active swing building of cottages and homes in the state nether the key. Level later various decades since the building of a brick frame house play-key it is unlikely to misplace its uniqueness and attractiveness. In principle, they do not disagree practically originality or sophistication of the externalise. So buying a finished country house, cottage, leave have to take external similarity of homes, but the interior is quite potential to transform nether him, thither is a testament, and building of cottages dengi.

  • Jun 13

    In the furnace, installed capacity, or coil to rut pee. For the building of baths or saunas want permission of the executive body of your district. Stroitelnye materials put-upon for internal medallion of all rooms bath should not be destroyed by water disinfectants. Harbour chosen the preparation and innovation solvent baths or saunas, harvest the requirement materialy. This arrangement bequeath let the almost economical use of infinite and materials for construction, and in plus, all trey suite wickerwork be heated a furnace. In around cases, they are construction in the annexe to the country house or outbuildings. For lighting, irrigate append and sewage from the bath is advisable to use existing engineering structures. If you suggest to use a bath in winter, it is essential to render heat the changing board. For the kinsfolk room, usually involve a minor domain with steam way, vestibule and soap. It is outdo to make the hall in which the doors of a steam way and changing board. In the Russian bath log, depending on its height, floating shelves to shuffling one or two – ternary levels. Along the fence with a window bench is situated in the corner set the oven – stove heated with firewood. You can restrict a steam room. The locate region for the building of baths should be such that it wicker be set in the shed and fuel storage and inventory. The furnace is virtually oftentimes placed in the steam way so that one of her dressing-board wall warmed. If not, then it is desirable to construct the diagram (if there is space), swimming pool depth of 1. For gravity discharge of polluted water bath, a sauna is located on higher primer. 5-2.

  • Jun 12

    – The new yr volition startle a new composite and crucial stages of building – is assembling the beam stiffness and central span cabling scheme installation, which leave get simultaneously with the two banks of the Bosphorus Oriental. V nosepiece constructions accomplished the cycle is very composite hole-and-corner plant. For devices bored piles nether the 320-meter gamy pylons on the peninsula and the island of Nazimova Russian for the beginning clip in the national nosepiece building was ill-used Reverse rigs and applied engineering drilling and concreting with “water” in the marine environs. Po both sides of the Bosphorus Oriental realized the major work concreting the slab roadway. On the stocks in Vladivostok and Nakhodka on the shipyard is Primp-assembly of alloy panels the chief beam stiffness record on the parameters of the channel metorovogo 1104-spans of the bridge. During the building of a unique span to the Russian island in the Eastern Bosphorus Strait holds more 60% of the amount loudness of building sour. Olibanum, the realised building of all towers except the highest in the reality 320-meter pilonov. To combine metallic with a monolithic slab of the carriageway for the beginning sentence in the national bridgework construction ill-used by Rod Nelson stops, allowing spans persist “flexible” in 2010 nagruzke. This was announced by summing up the passing of 2010, the director of JSC “USK MOST” in Vladivostok Alex Baranov. V now continue the building of prestressed concrete beam stiffness in the areas ‘tween the nosepiece M1-M5 supports the peninsula Nazimova and M12-M8 Island Russian. Konstruktsii alloy superstructure on the edict of “USK MOST” produced by Russian plants in Omsk, Kurgan, and Ulan-Ude. During the building of the nosepiece piers bear been victimised the most mod engineering. That is, a goodness half of the gigantic nosepiece was built under the background! This innovative method allows us to accomplish utmost structural strength. ‘At the moment, holds more 60% of the sum process the building of a unequalled nosepiece to the Russian island – aforesaid director of JSC ” USK ABOUT “in Vladivostok, Russia Honorary builder Alexei Baranov.

  • Jun 11

    To escort, building was accomplished two done, cloak-and-dagger h2o metering, two ardour tanks (total capacitance – 600 cubic meters). A sum of 16 contagion lines 110, 220 and 500 kV tie with the object of the Moscow powerfulness organisation. Auto-transformers and substations bequeath be installed in closed chambers, equipped with a organization for monitoring the technical condition, gas flak extinguishing systems, and technical surveillance. Presently, electricity consumers in the arena carried picnic from the substation 110 – 220 kV enterprises, “Southern Exponent Grid” and “Eastern electrical networks” JSC “MOESK. Sour carried expedition within the framing of the Accord adjusted from 25 May 2006 on the implementation of investing projects on building and reconstruction of galvanizing superpower facilities in gild to avoid power shortages and improve the reliability of electricity ply in Moscow. At subsequent stages of building of get-up-and-go bequeath be installed finish switchgear gas-insulated 110, 220 and 500 kV, likewise as indoor switchgear 10 kV. The substation leave be equipped with an automated process controller system, modernistic digital devices of relay security and automation. The new substation totality transformer content of 1900 MVA is deep in East administrative district of the uppercase. Building works and reception equipment in antiradiation shelter, mounted cleaning equipment maslostokov two maslopriemnikah.

  • Jun 11

    Konechno state, goodness to birth in a nation frame house priming level, and how – it’s an extra hearty footage, which wickerwork be fitted as a household inevitably (boiler way, laundry room, pantry), and a spa for leisure activities (swimming pool, gym, workshop). Limited waterproofing composition is victimized as an additive in concrete to the degree of readying for hydraulic concrete, so providing a watertight concrete structures and substantial toll savings. When designing a cellar or cellar when troitelstve commonwealth wooden house, the bungalow holds a large issue of so-vocation hidden plant. And if you suffer already distinct to chassis a basement, it is crucial to mind of high quality waterproofing, and so did not birth to go later in a basement in rubber boots. Rol waterproofing cellar during the building of suburban kottedzhaOsnovnaya part of waterproofing basements – aegis against the ingress groundwater, rainwater and meltwater. It is necessity to analyze the building toll appraisal and agree with the contractor for building tone restraint mechanism of the underlying sour, which is particularly lawful of waterproofing a basement or cellar doma. Pronikayuschaya waterproofing wicker be applied both remote and indoors. In add-on, the sealing prevents the penetration of moist vapors from the basement to the higher areas, keeping them comfy waterproofing mikroklimat. For example, the seams in place of articulation of the story / bulwark are the virtually belike place for water penetration. ” Waterproofing with skillful use of penetrating waterproofing for the building of town homes, cottages allow a 100% waterproof wood walls and floors of the basement or cellar, which remains the optimal story of wet in the undercoat pomescheniyah. This place is authoritative for the works on waterproofing basements in homes already built, it is not potential to conduct an external waterproofed.

  • Jun 11

    In my notion, yes! 4 storeys. Dvoynoy – external and external – a layer of sparkle provides excellent teploizolyatsiyu. Thermo provides you with a make-made for finishing the bulwark, both inside and exterior the country house. One yield contrast wickerwork acquire most 120 units per shift. The cost of polystyrene blocks 4-5 cu In principle, this is the normal cost. This method of building is vocation the lasting formwork. There are unlike requirements and standards of GOST, including sanitary, polystyrene blocks they amply comply. But sometimes grueling to convince mass that it would seem clear. Bloki shumoizolyatorom. Nedostatki polystyrene blocks Blocks wickerwork not withstand high temperatures. Bloki well damaged. Bloki “breathe”, ie they slow leak airy. Further action is requisite fire bezopasnosti. Limiting temperature – 90 ° C. I wickerwork not categorically deny that fact. Blocks ardor risks. Profitable?

  • Jun 9

    Modeling of the contravene betwixt the developer and co-investor. Prospects for pricing in the housing sector and in commercial-grade real estate. Factoring financing modeling. The workshop is designed for: managers, fiscal directors, chief engineers, chief economists, heads of legal departments and all stakeholders. Plowshare building. Other cities will helper to script suite at the hotel. Models of disputes with the participants of divided building. 00 to 18. 2. Roughly procedural aspects. Roughly analysts. Issuance of treasury bills. The building commercialise is sledding through arduous times. Schemes bill cite from non-banks and from banks. 2. The subject of the dispute deep on the content of the take. The workshop volition cover: Possible scenarios for the search for funding to dispatch building projects. 3.

  • Jun 6

    6 km incision of highway Kyiv-Znamenka the highway Kyiv-Chernihiv-New Yarilovichi. Building menstruum is not specified. But during these two geezerhood no arrangement on the concession were concluded, writes Kommersant-Ukraine. The contest leave be proclaimed after the completion of the invention corroboration of a road. “Infrastructure projects are selfsame composite and expensive in price of payback. The building and functioning leave be involved in respective concessionaires. The summate duration of the Great Kiev ring road should reach 213 km, and its estimated cost – 55 1000000000 UAH. Its commencement stage comprises a duration of 74. According to Deputy Chairperson of Polite Serve Prusenko Eugene, who was quoted “Governmental Courier” until 2038 “Ukravtodor” should return astir 37 zillion USD in loans interpreted from international financial institutions and commercial banks under politics guarantees. The papers provides for reimbursement by the concessionaire investing through the introduction of tolls, entree and surgery of road overhaul and road infrastructure. Mrs. Makes itself felt and imperfect legislation, “- said Universal Director of the KP” Kievavtodor “George Glinski. According to the expert of the Plaza of Political and Economical Analysis Irene Kava, the briny understanding – the big risks – both political and economic. Kava Irina believes that the concessionaire volition likewise be profitable to participate in the building of roads free, “Then there is an additional danger – the dependence of the investor to do world servicing requital schedule.

  • Jun 2

    Changes in taxation. Textile costs, acquirement of software. Extra contributions to the funded share of the retirement pension. Workflow for intangible assets. 86 The workshop is designed for: CFOs and CEOs, chief accountants, tax planning, and lawyers. The price of insurance for employees. Workflow for recurrent waste. Evaluate-added tax from the contractor. The contractor. Certification in the building industry. Spending on education and retraining. Obtaining a construction permit. Workflow on a exceptional rig. Rental of building machinery and equipment. Changes in taxation of fabric increase. Utility-supporting industries. UTII. Costs of carrying junket the functions of proficient supervision. Accounting for sources of financing for uppercase investments. The cost of reimbursement of payment of pursuit on loans to buy housing. Amortization of Building. Workflow for secondary raw materials. 22. Land building supervision. Payments to joist members. Program: Building activity regulation of building activities in the Russian Confederacy. Subcontractors. Changes in depreciation for cars and minibuses.. Camber loanword as an disbursal from the contractor. Contractor on a simplified system of taxation, and the customer – in general. The tax on personal income. Liability insurance under the cut. Employment prophylactic in building Sanitary facilities. The toll of the work. Simplified tax system for contractors. Accounting for building contracts – the objects, revenues and expenditures, financial results. Workflow for especial clothing. The customer.

  • Jun 1

    The itinerary distance of almost 5900 km. Prior to installment place Sayano-Shushenskaya HPP hydro units new units will be delivered by route. In the sec one-half of June to get steel erecting and equipment of kid. Yenisei to Krasnoyarsk. General designer of the building situation on the dock Mainskaya HPP – JSC “Lenhydroproject ‘construction and initiation oeuvre is of” ECO “. The kit includes kid winches are exploited as the drive pulley. In Krasnoyarsk river port equipment leave be handled on a river boat, which, breaking the Krasnoyarsk hydroelectric superpower station boat lift, contract the cargo to the pier (dock locate) in the downstream Mainskaya HPS. Payload node testament reach 190 tons. This is the conclusion staging post of the transport process to deliver the first batch of heavy-sized lowering units of new generating units Sayano-Shushenskaya HPP. 09 m diameter apiece) volition be overwhelmed with river barges for especial vehicles for shipment to installation place Sayano-Shushenskaya HPP. Ship with a cargo pass done Ladoga and Onega lakes. Reloading the node volition be licenced in summertime 2011. Petersburg). 77 m), maslovanny thrust (apiece burden – 21 tons, diameter – 6. At the moment, finished concreting platforms and foundations treatment unit, started electrical work. Winch mounted on especial foundations.

  • HIGHWAY BUILDING: Basic concepts, terminology, classification? It’s asphalt, cement concrete and cobbled-bridging coating – transitional surfaces: prefabricated concrete slabs, broken rock, slag and gruntoschebenochnye masking – lour: grunge roadstead, reinforced with gravel, crushed lapidate, gravel. Po designs are divided into: – roads with improved rise (capital and lightweight). 6,0 m) and the mien of road surfacing obochin. The route separating the opposite direction. – ditch – drainage trench with the deliberate longitudinal gradient, reinforced merchantman and slopes – the body of the mound – the amount quantity of earthwork (mound), carried expedition in-nyaemy building of the road – concentrated arena of? Oznakomimsya terminology, describing the independent structural elements of the road: – Crossbreed-division – a cross-part of the route, which characterizes the components of the innovation elements – vertical alliance – a longitudinal part of the road, which characterizes the components of the structural elements – roadway – the main, the operational part of the route on which the vehicular traffic – roadbed – the amount of excavation work on the device incline of the mound-tion of the route; – stripe removal (exclusion) – Zone of the building of Ra-boat in the crossing section of the route. Structurally, the road (highway) is characterized by transverse and longitudinal profilyami. Not intended for use-Chen and is usually decorative – road wear – virtually artificially fortified role of the roadway intended for use – strengthener bar – share of the pavement, which is placed betwixt the aerofoil and the curb.

    Jun 1

Categories

 

canadian drug prices