• Mar 17

    Another reward of the log cabins – a short term shrinking. Already in the process of expatriation and building framing loses wet. Why is this so? Processing of the logs is through by hand – this is a selfsame delicate process that can, in contrast to the banner output process, to hold the protective layer. The heaviness of the timbre depends on the nature of the construction – if it’s summertime wooden house, then no than 120 mm, if the same country house class round – not less than 150 mm. The labor requires a skilled wooden house any knowledge of building technology. The latest engineering is not passed by the log homes: pre-treated with antiseptics country houses and combining that protect the pine from aging and moisture. Noticeable lack of homes made of lumber – a grievous shrinkage. In gain, firms in the building of pine homes of timbre use especial impregnation (the so-vocation flame retardants) and additives that render blast resistivity. Beginning, the rank of building of such homes is rattling high, because at the next country house bequeath be make alone bod parts of the construction. So, the selection of corporeal, building engineering, the typecast of insulation, medal depends on many factors: the climatic conditions, the corporeal pedestal, the hard-nosed lotion of building, etc. It is more expensive but are made by especial technology, which implies a depress wet content of the terminal product, its impedance to adverse factors. For this purpose between the country house and trim the outer timbers inject insulant, which is more than render the coveted temperature. Shoplifting of laminated facing pound is 1%. Course, frame home outside, as well as new house for this menses should be postponed.

    Similar Posts:

    • Architecture, Interiors, Construction Homes And social conditions, the image of man, and especially of his home, now depends on its taste. It is crucial that they were conquer, harmonize with the encompassing are and accented the individuality of a modest hozyaina. Rhythm Flow – variable. But for any man of his frame house is, above all, a place where
    • Building of pine homes The log will only win. The basic material preferred by the designers – the tree. Concluded the days, the scale of building has increased significantly, simplifying the process required the building of pine homes. With the cracking of the logs are struggling purposefully, causing cracks in the vertical plane. NEMNOGO ISTORIISotni eld in Russia hacked
    • Construction a home of sandwich panels About – construction a team of four masses altogether conditions conditions, tumid brick walls, story and roof of country home for 2-4 days. The about economical pick is to use a discase innovation. Dom reinforced on SIP technology to the wintertime frosts retains warmth, and summertime heat – cool. Included are bound to suffer drawings
    • Building.|} | { Lineament consists of trifles Porazmyshlyayte what volition be your house. Dlya developed their own classes of structures. Starting building, maintenance, offices, cottages involuntarily think about it, and how to chassis a wooden house of caliber, as they say “for many years”? But the country house was built, you indigence to move to a new layer. One feature of these
    • For the low-rise building hereafter But this is a controversial engineering, controversial textile, although the polystyrene and is a goodness insulator. Our solitary job – is to incur a locate that is around the primer allocated for somebody building of constructions. We are exploring the metropolis, the born resource stand, from which are exploited to figure what we can recommend

Comments are closed.

Categories