• Belarus begins negotiations with the Ministry of Finance for a lend for the building of nuclear exponent plants

    Mar 5

    Succeeding – let’s see, “- said Kiriyenko. We felt that in September has already signed the net declaration. V routine, Surrogate Prime Minister Igor Sechin demanded that the building schedule and the Baltic NPP Belarusian send were adjusted for consumption of the Kaliningrad area. Itar-Tass reported tod Director General of the Posit Atomic Push Corporation “Rosatom” Sergey Kiriyenko. Belarusian delegation to February 10 will start negotiations with the Ministry of Finance for a loan for the building of nuclear mightiness plants. Po him, in September of 2011 building leave commence excavation at the situation where the implant bequeath be reinforced. Necessity, in raspberry feeling, to consider the issues and marketing. ” “Generally speaking, – he continued – below the flow schedule, if our Belarusian colleagues in a timely manner to concluded all work on locate, and they are comfortably done in this respect and has done a great job on the discipline ar, in September, could start excavation employment at the situation. ” “This means that the actual process of construction the engraft bequeath get in September,” – aforesaid World-wide Director Rosatoma.

    Similar Posts:

    • Belarus begins negotiations with the Ministry of Finance for a loanword for the building of nuclear might plants Participate the low unit nuclear plant is planned in 2017. – According to this chart, we assume the signature of an intergovernmental arrangement in the first quarter of this class, I retrieve that in the near hereafter to determine the exact appointment. This was proclaimed by the surrogate nous of the Commonwealth Corporation “Rosatom” Alexander
    • In the nickel plant, building of new chimney Novaya pipe about 20 feet supra the existent and would help to divert gas kiln set workshop. On Tuesday, visited the building site of the Polar Division Director “Norilsk Nickel” Eugene Ants and was pleased to uvidennym. Which aims to dilute the elf of emissions on the metropolis. The projection is serious, it be some
    • Gazprom completes the building of gas pipelines The system of gas pipelines “Ukhta-Torzhok” is intended for Yamal gas provide to the Central area. At deliver, the linear parting of the grapevine is reinforced (900 km), is below building with a summate duration of loopings 700 km. At COP “Lukoyanovskaya” and “Ivanovo” continued commission, the COP “Vyaznikovskaya” is being installed four pumping units
    • Gazprom completes the building of gas pipelines Subsequently Gryazovets website is provided by the gas add in the line “Nord Stream”. At COP “Lukoyanovskaya” and “Ivanovo” continued commission, the COP “Vyaznikovskaya” is beingness installed four pumping units (GPU) with a summate capacity of 64 MW. Building of the line system for gas supply to the “Nord Stream” came to the finish cable,
    • Building of Baltic NPP eyes of Lithuanian journalists – But get-go we lack to employ residents of the Kaliningrad area. This time, later a lecture most “peaceful atom” in the information plaza, which is housed in the Maritime Museum in Kaliningrad journalists invited to visit the building site, showing “maximum openness. The head perpetually wondered some the Lithuanian Ignalina reaction was not and

Comments are closed.

Categories

 

Error. Page cannot be displayed. Please contact your service provider for more details. (27)